Similar Projects
Last Updated | 12/22/2021 05:35 AM |
Project Title | Bridge Replacement - PPCB |
Physical Address | View project details and contacts |
City, State (County) | IA (Pottawattamie County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 0001 Roadway Items - Imx-029-4(112)72--02-78 0002 Alternate Aa Option 1: Pcc Shoulder, Bid This Section If Alternate ‘Aa’ Option 1 Is Chosen 0003 Alternate Aa Option 2: Hma Shoulder, Bid This Section If Alternate ‘Aa’ Option 2 Is Chosen 0004 Design No. 0122; 252'-0 x 36'-0 Pretensioned Prestessed Concrete Beam Bridge - Brfimx-029- 4(113)72--14-78 0005 Roadway Items 0006 Traffic Signs Items - Imx-029-4(115)72--02-78 0007 Roadway Lighting Items - Imx-029-4(116)72--02-78 0008 Payment Adjustment Incentive Items Route: i-29 Co Rd g12 Interchange 0.4 Mi n Of i-880 10.00 Each Beams, Pretens. Prestr. Conc. 1.00 Lump Sum Construction Survey 332.00 Cubic Yard Excavation Class 20 1,449.10 Square Yard Longitudinal Grooving In Concrete 5,605.00 Linear Foot Pile, Steel h, 10 In. 558.00 Linear Foot Rail, Concrete Barrier 4,334.00 Pound Reinforcing Steel 118,027.00 Pound Reinforcing Steel, Epoxy Coated 4.00 Each Steel Beam g'Rail Barrier Trans Section 530.30 Cubic Yard Structural Concrete 8,913.00 Pound Structural Steel Route: i-29 Co Rd g12 Interchange 0.4 Mi n Of i-880 10.00 Each Aprons 5.00 Acre Clearing & Grubbing 1.00 Lump Sum Construction Survey 383.00 Linear Foot Culvert Pipe 276.80 Square Yard Drives, p.c.c. 26,821.00 Cubic Yard Embankment-In-Place 3,757.00 Cubic Yard Excavation Class 10 238.20 Cubic Yard Excavation Class 13 300.00 Cubic Yard Excavation Class 20 1.00 Each Field Laboratory/Office 50.00 Cubic Yard Flowable Mortar 341.00 Cubic Yard Granular Backfill 603.00 Cubic Yard Modified Subbase 4.37 Acre Mulching 3.71 Acre Native Grass Seeding 7,912.20 Square Yard Paved Shoulders 31.66 Station Pavement Markings 5,804.00 Square Yard Pavement, p.c.c. 980.00 Square Yard Removal Of Pvmnt/Drives/Sdwk 0.66 Acre Seeding & Fertilizing 86.60 Station Shoulder Construction 43.30 Station Shoulder Finishing 8,600.00 Linear Foot Silt Fence 2,386.00 Ton Special Backfill 868.00 Linear Foot Subdrain 957.20 Linear Foot Subdrain, Longitudinal 217.00 Ton Surfacing, Crushed Stone 1,535.00 Linear Foot Temp. Barrier Rail 4.00 Each Temp. Traffic Signals 5,747.00 Cubic Yard Topsoil, Strip/Salvage/Spread Route: i-29 Co Rd g12 Interchange 0.4 Mi n Of i-880 2.00 Each Concrete Footings For Signs 513.00 Linear Foot Posts, Metal, For Signs 172.00 Square Foot Signs, Type a 450.00 Square Foot Signs, Type b Route: i-29 Co Rd g12 Interchange 0.4 Mi n Of i-880 1.00 Each Control Cabinet 2,635.00 Linear Foot Electrical Curcuits 10.00 Each Handhole 3.00 Each Lighting Poles |
||||||||||||||||||||
Details | Bridge, New Construction.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |