Similar Projects
2021 CDBYI Project (Community Development Building Yard Improvements)
Infrastructure
Post-Bid
Eagle Mountain, UT 84005

Lindon Community Center Southeast Entryway Upgrade
Infrastructure, Alteration
Post-Bid
Lindon, UT 84042

DFCM Construction - VBS Design/Build - WSU Noorda A2 Lot & Paid Parking Lot
Results
Less than $3,308,642 est. value

Payson Forebay Parking Lot
Results
$199,420 est. value
Payson, UT 84651

Mountain Ridge Park - Phase 1
Renovation, Infrastructure
Post-Bid
Highland, UT 84003

800 South Road Improvement Project
Results
Alpine, UT

2022 Sidewalk and Retaining Wall Project
Infrastructure
Post-Bid
Alpine, UT

2021 Provo Terminal Parking Lot and Loop Road Project
Results
Less than $7,510,234 est. value
Provo, UT

Parking and Path Improvements at Heritage Park
Infrastructure
Post-Bid
Cedar Hills, UT 84062

Construction of the Genola Public Safety Building Parking Lot
Results
Genola, UT

Disc Golf Parking Lot
Infrastructure
Post-Bid
$200,000 est. value
Spanish Fork, UT 84660

Public Works Site Improvements - Parking Lot
Results
Saratoga Springs, UT

820 N Provo Ped Crossing Railway-Highway Grade Crossing/Railroad Safety
Results
$500,000 est. value
UT

Sunrise Meadows Bike Park
Infrastructure
Results
$486,998 est. value
Saratoga Springs, UT

2022 Provo City Sidewalk Replacement Project
Infrastructure
Results
Provo, UT

Reported 05/04/2022 12:00 AM
Project Title

American Fork City Art Dye Park - Parking Lot Expansion

Physical Address View project details and contacts
City, State (County) American Fork, UT 84003   (Utah County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $325,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The American Fork City Art Dye Park - Parking Lot Expansion consists of: Installing curb, gutter, sidewalk, parking lot construction, asphalt striping and storm drain facilities within the Art Dye Park. Work includes removing existing portion of curb, gutter and sidewalk, grading and existing utility connections. Work to be performed includes all items necessary to proposed improvements including, but not limited to, mobilization, traffic control, excavation, backfilling, surface restoration, and inspections.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents