Similar Projects
Contractor - Lead Private Service Line Replacement Program
Infrastructure
Design
Shorewood, WI

UWMIL Central Heating Plant Chiller Replacement
Renovation
Design
$13,360,000 CJ est. value
Milwaukee, WI 53202

RFP - Annual Emergency Generator Servicing and Testing at System Wide - Various Locations
Term Contract
Bidding
Milwaukee, WI 53202

RFP Engineering - Professional Design Services Oak Island Skate Park
Infrastructure
Bidding
$300,000 CJ est. value
Wausau, WI 54403

RFQ - ARC Flash Study
Term Contract
Post-Bid
West Milwaukee, WI 53214

Engineering - Two Rivers - Maribel
Infrastructure
Post-Bid
$7,000,000 to $7,999,999 est. value
Mishicot, WI 54228

Chiller Replacement For Boys And Girls Club - Rogers Street Academy
Alteration
Results
$300,000 est. value
Milwaukee, WI 53204

NOI RFP Engineering - Green Bay - Manitowoc
Infrastructure
Pending Verification
$15,000,000 CJ est. value
Reedsville, WI 54230

New Public Safety Communications Facility - Dane County
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
McFarland, WI 53558

RFP - Planning/Admin
Term Contract
Bidding
Metomen, WI 54971

Broadband Infrastructure Engineering Assessment
Infrastructure
Post-Bid
Madison, WI

Microbial to Radio Hall 15kV Cable Replacement Phase II/ University of Wisconsin-Madison
Renovation
Pending Verification
$4,999,000 CJ est. value
Madison, WI 53706

RFP - Rail Corridor Safety Study Grant
Term Contract
Bidding
Milwaukee, WI 53202

Engineering - Active Transportation Plan
Infrastructure
Post-Bid
Ripon, WI 54971

RFP - Environmental Study - Don A Tillman Bridge
Term Contract
Pending Verification
$45,000,000 CJ est. value
Green Bay, WI 54302

Last Updated 01/03/2024 12:08 PM
Project Title

RFP Engineering - Perpetuation - Resurface on IH 94 - STH 121 to STH 95

Physical Address View project details and contacts
City, State (County) Hixton, WI 54635   (Jackson County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected July 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 3, 2023, this project is in the conceptual phase. An engineer has been selected but not awarded. Although a firm timeline for construction has not been determined, construction is not expected to start prior to July 2024. *The closed solicitation has been included below for reference: 1024-02-01: Perpetuation project to resurface 6.81 miles on IH 94, Towns of Northfield, Curran, and Hixton and Village of Hixton, Jackson County from STH 121 to STH 95. Work includes replacing wings on box culvert structures C-27-17,23,and 24 and resurfacing ramps on STH 121 south ramps and portions of STH 95. Additional work on both projects includes concrete pavement repair, adjusting guardrail, replacing guardrail, replacing three beam bullnose systems, culvert work, type 1 sign replacements, and pavement marking. Work will be done under traffic utilizing single lane closures during off-peak traffic time periods Anticipated Construction Cost: $17,000,000-$19,999,999 The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Advertised Fixed Fee % : 7.25 Fixed Fee Notification : The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interview: Interviews will not be conducted The method of contractor selection has not been determined at this time. WisDOT - NW-02 RFP Engineering - Perpetuation - Resurfacing

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents