Similar Projects
Student Activity Center Renovation - Auburn University
Renovation
Conception
$5,000,000 est. value
Auburn, AL 36849

New Aquaculture Barn - Auburn University
New Construction
Conception
Auburn, AL 36849

STEM Ag Sciences Complex - New Facility
New Construction
Design
$165,000,000 est. value
Auburn, AL

Parker Creek Townhomes
New Construction, Infrastructure
Design
$5,280,800 CJ est. value
Auburn, AL 36832

Renovation of Space for the School of Kinesiologys Doctor of Physical Therapy Program
Renovation
Bidding
$3,000,000 CJ est. value
Auburn Univ, AL 36849

Fy 23 Streets Re-striping Project
Infrastructure
Bidding
$250,000 CJ est. value
Auburn, AL 36830

Renovations to Southside Center for the Arts
Renovation
Post-Bid
Opelika, AL 36801

Campus Wide - Job Order Contract (JOC) Program for General Works
New Construction
Post-Bid
Auburn, AL

Pebble Hill - New Visiting Scholars Residence
New Construction - 680 SF
Results
Auburn, AL 36830

Facilities Management Training Center - New Facility
New Construction, Infrastructure - 9,600 SF
Results
$2,071,279 CJ est. value
Auburn Univ, AL 36849

Graduate Hotel / Auburn
Demolition, New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Auburn, AL 36830

Niagara Bottling LLC Manufacturing Plant at Northeast Opelika Industrial Park
New Construction, Infrastructure
Construction
$112,000,000 CJ est. value
Opelika, AL 36801

National Chain Retail Store - Reveille's Outpost / Auburn
New Construction, Infrastructure - 9,500 SF
Pending Verification
$2,000,000 CJ est. value
Auburn, AL 36832

Chapel Heights
New Construction, Infrastructure
Pending Verification
Auburn, AL

MLK Streetscapes - City of Auburn
Infrastructure
Conception
$5,507,000 CJ est. value
Auburn, AL 36832

Last Updated 06/30/2023 03:10 PM
Project Title

Auburn STEM and AG Sciences Complex

Physical Address View project details and contacts
City, State (County) Auburn, AL 36830   (Lee County)
Category(s) Commercial, Education, Heavy and Highway
Sub-Category(s) College/University, Food/Beverage Service, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $178,675,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

STEM & Agricultural Sciences Complex New Facility AUBURN UNIVERSITY Facilities Management Building One, Training Room A/B SCOPE OF WORK: The general scope of the work includes but is not limited to: New complex for 6 departments within the College of Science and Mathematics (COSAM) and the College of Architecture. Scope of work includes approximately 265,000 GSF of new construction at the former Hill Dormitory site on Auburn University's campus. BONDS: A certified check or bid bond payable to Auburn University in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000.00, must accompany the bidder's proposal. Performance and Statutory Labor and Material Payment Bonds will be required at the signing of the Contract. BIDS: Bids must be submitted on proposal forms or copies thereof furnished by the Architect. Dr. Christopher B. Roberts, President Auburn University Auburn University, AL 36849 Prequalification is required for this project. The prequalification application is available on the Auburn University Public Works Bid Calendar located at: electronically. For all questions or inquiries about this project, please contact: Mary Melissa Taddeo, marymelissa.taddeo@auburn.edu; 334-758-1235

Details

265,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Plumbing Insulation, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents