Similar Projects
2022 Clay Road and Elm Tree Drive Traffic Signal
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Houston, TX 77002

Formal - Purchase of Machinery Components for BCT and BPT Terminals
Term Contract
Sub-Bidding
Houston, TX 77002

Lawn Equipment
Post-Bid
Houston, TX

Electrical Supplies And Lamps
Alteration
Post-Bid
Pasadena, TX

High Density Shelving Material Supply Inventory Replenish System
Results
San Antonio, TX 78236

Fire, Safety, Security, Surveillance, Equipment, Service and Related Items
Results
Houston, TX

Plywood
Term Contract, Alteration
Post-Bid
Spring, TX

Y1da--Open MRI Site Prep, Houston VAMC , Project No. 580-18-119
Results
$500,000 to $1,000,000 est. value
Houston, TX

Concrete Meter Boxes W/Lids
Alteration
Post-Bid
Houston, TX

Walk Thru Metal Detectors (WTMD)
Results

7290--580-21-3-167-0824 - Medvamc Replacement Tvs (Va-21-00080542)
Term Contract
Post-Bid
Houston, TX 77030

Informal - XL3100 Hydraulic Excavator for TBT CMAIN
Results
Houston, TX

Security Equipment and Monitoring Services and Related Items for Harris County Precinct 4
Alteration
Post-Bid
Houston, TX

Annual Requirements Contract for Water and Sewer Supplies
Results
La Porte, TX

Lawn Care Equipment Repair Parts Related Items and Services
Alteration
Post-Bid
Pasadena, TX

Last Updated 09/16/2022 12:10 PM
Project Title

Purchase and Installation of Kitchen Equipment for Six Schools

Physical Address View project details and contacts
City, State (County) Houston, TX 77002   (Harris County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For the Purchase and Installation of Kitchen Equipment for six schools located in Houston, Texas. There will not be a pre-bid meeting. The method and criteria for evaluation of proposals is listed in the RFP at Section 5; contract(s) will be awarded to the responsible proposer(s) whose response(s) is/are determined, after evaluation by KIPP, to be the best value to KIPP. KIPP estimates that contract award will be September 23, 2022. The method of payment for contract(s) awarded pursuant to this RFP shall be USDA/TDA child nutrition funds. KIPP reserves the right to reject any or all proposals or waive any or all irregularities.

Details

Division 11 - Equipment, Operation and Maintenance of Equipment, Vehicle Service Equipment, Maintenance Equipment, Unit Kitchens, Residential Equipment, Residential Appliances, Agricultural Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents