Similar Projects
SR 539/Bay-Lyn Dr to International Boundary - Corridor Improvements
Infrastructure
Conception
$27,000,000 est. value
Lynden, WA 98264

D/B - GSA LPOE Pacific Highway, WA. Lane Expansion Project
Infrastructure
Design
$20,000,000 est. value
Blaine, WA 98230

Road Overlay
Infrastructure
Post-Bid
Sumas, WA

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Small Area Paving Project - 2021, CRP No. 921006
Infrastructure
Results
$190,000 to $220,000 est. value
Bellingham, WA

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

I-405, NE 85th Street Interchange and Inline BRT Station Project
Term Contract
Post-Bid
$210,000 est. value

Mill Avenue Overlay ES-556
Infrastructure
Results
$1,300,000 to $1,500,000 est. value
Bellingham, WA 98229

Lawson Street and Mitchell Street Overlay Project
Infrastructure
Post-Bid
$3,000,000 est. value
Sumas, WA 98295

Sr 546, Pepin Creek and Duffner Ditch Fish Passage
Infrastructure
Results
$2,000,000 to $3,000,000 est. value
WA

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

IDIQ Asphalt Pavement Repair Services
Term Contract
Results
$2,100,000 to $2,500,000 est. value
Bellingham, WA

West Front Street Reconstuction
Term Contract
Results
$3,000,000 est. value
Lynden, WA

SR 20, Rocky Creek to Granite Creek
Infrastructure
Results

Ls Resurfacing 1
Term Contract
Results
$997,219,550 est. value

Last Updated 07/13/2022 11:00 PM
Project Title

South 6th Street CIPP

Physical Address View project details and contacts
City, State (County) Lynden, WA 98264   (Whatcom County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This contract provides for the Cured in Place Pipe Lining of approximately 1560 feet of existing 20" sewer main beginning at Judson Alley, going south along 6th St., and ending near the headworks building of the Lynden Wastewater Treatment Plant. Work will include cleaning and jetting the sewer main, trimming service lines protruding into the sewer main, trimming hanging gaskets, placing Cured in Place Pipe Lining throughout the length of the main, reopening existing sewer services, and rehabilitating manholes.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents