Similar Projects
Purchase of Asphalt - 1/2 inch Minus for 2021 Season
Bidding
Cedar City, UT

Crushing and Stockpiling
Post-Bid
Cedar City, UT 84720

Re-Use Center Crushing
Post-Bid
Saint George, UT 84790

Requirement for Road Base and Cobble Stone to REBU
Results
UT

Crushing and Stockpiling
Results
Cedar City, UT 84720

Cover Material Region 4
Post-Bid

Supply of Chip Seal Aggregate
Post-Bid
Saint George, UT 84770

2020 Asphalt
Post-Bid
Price, UT

2020 LIV1CRS-2 Chipping Oil
Post-Bid
Price, UT 84501

Crushing and Stockpiling
Post-Bid
Cedar City, UT 84720

Chip Seal Oil Supply
Post-Bid
Saint George, UT 84770

Hot Mix 2020
Term Contract
Post-Bid
Cedar City, UT 84721

Crack Seal
Post-Bid
Salina, UT 84654

Furnish and Deliver Bentonite Clay to Gordon Creek Wildlife Management Area
Post-Bid
Price, UT 84501

Supply of Chip Seal Aggregate
Post-Bid
Saint George, UT 84770

Reported 04/22/2020 12:00 AM
Project Title

Liquid Asphalt Region Four

Physical Address View project details and contacts
City, State (County) (Beaver, Carbon, Emery, Garfield, Iron, Kane, Millard, Piute, San Juan, Sanpete, Sevier, Washington, Wayne Counties)
Category(s) Heavy and Highway
Sub-Category(s) Aggregates
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This contract is for the purchase of Liquid Asphalt Materials as described in the Specification. 1.Vendor must supply Liquid Asphalts under the UDOT Materials Qualified Supplier program. Refer to the UDOT Quality Management Plan Section 508 - Asphalt Emulsion and 509 - Asphalt Binder. 2.Refer to Part 2 of UDOT Specification Section 02745 -Asphalt Materials for Liquid Asphalt requirements. 3.Liquid Asphalts are defined as Asphalt Binders, Emulsions, and Cutbacks as identified in Section 02745. 4.If noted, dilution rates for emulsions are based on a ratio of concentrate to water, e.g. a CSS-1 Diluted 2:1 is a dilution consisting of two parts of a CSS-1 concentrate and one part water.

Details

Division 32 - Exterior Improvements, Aggregate Surfacing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents