Similar Projects
Costco / Longmont
New Construction, Infrastructure - 150,000 SF
Conception
$12,000,000 CJ est. value
Longmont, CO 80501

Murphy Express #8635 / Louisville
New Construction, Infrastructure - 2,800 SF
Design
$2,500,000 CJ est. value
Louisville, CO 80027

North Drive Drainage Improvements - Lyons Middle/Senior High School
Infrastructure
Design
$200,000 CJ est. value
Lyons, CO 80540

US 36 Bike N Ride Shelters Construction
Infrastructure
Bidding
$650,000 CJ est. value
Broomfield, CO 80020

Eldorado Canyon State Park Entrance Improvements Project
Infrastructure
Bidding
$900,000 CJ est. value
Eldorado Springs, CO 80025

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

Longs Peak Raw Water Main Project
Results
Longmont, CO 80504

On-Call Boring and Maintenance Services
Results
Longmont, CO

Marshall Road and Creek View - Infrastructure
New Construction, Renovation
Construction
Superior, CO 80027

Main Street Hotel / Lyons
New Construction, Infrastructure - 50,000 SF
Pending Verification
$15,000,000 CJ est. value
Lyons, CO 80540

2014 Bond - New Vista High School - Boulder Valley School District
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Boulder, CO 80302

The Ridgeway Science & Tech
New Construction, Infrastructure - 112,000 SF
Design
$65,000,000 CJ est. value
Boulder, CO 80301

Household Hazardous Waste - Dacono Concrete Drive
Infrastructure
Bidding
$80,000 CJ est. value
Erie, CO 80516

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

Last Updated 09/06/2022 03:31 PM
Project Title

Manhole Rehabilitation Program

Physical Address View project details and contacts
City, State (County) Boulder, CO 80302   (Boulder County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Question Acceptance Deadline 05/09/2022 07:00 PM EDT Questions are submitted online No The work shall consist of the rehabilitation of approximately 124 existing manholes within the City's sanitary sewer collection system. See Attachment 1 - 2022 Manhole Rehab Program Maps in BidNet for sets of maps of the manholes that the city anticipates rehabilitating in 2022. Manholes are located on a variety of local and trunk sewer lines throughout ten (10) geographic areas in the City. The City may elect to complete some or all the manholes depending on bid pricing. Buyer's Requirements General Requirements - Bid Deposit Required - Insurance Required - License Required Bonding Requirements - Bid Bond 5 % .

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents