Similar Projects
Stair Upgrades at Carteret High School, Carteret Middle School, Columbus Elementary School and Nathan Hale Elementary Schools
Post-Bid
Carteret, NJ 07008

Workshop Addition and Interior Alternations at East Brunswick Campus
Addition
Construction
East Brunswick, NJ 08816

District Wide Facilities ADA Improvements (Phase III)
Renovation
Post-Bid

Junior High School Project
Construction
Carteret, NJ 07008

Locker Room Renovation at Iselin Middle School
Renovation
Bidding
Iselin, NJ

Additions to West Windsor-Plainsboro High School North
Addition
Construction
$1,024,000 est. value
NJ 08536

Classroom Alterations and Auditorium Upgrades at Multiple Schools
Renovation
Results
$4,729,000 est. value
Piscataway, NJ 08854

Auxiliary Gym Addition at Cranbury School
Addition
Construction
Cranbury, NJ 08512

Alterations Phase 2 at Linwood School
Renovation
Construction
North Brunswick Township, NJ 08902

Auditorium Upgrades at Edison High School
Renovation
Bidding
$1,000,000 est. value
Edison, NJ 08817

Renovations to West Windsor-Plainsboro High School North
Renovation
Bidding
$2,000,000 est. value
NJ 08536

Addition at Matthew Jago School #28
Addition - 25,200 SF
Construction
Sewaren, NJ 07077

Domestic Hot Water Replacement and Partial Sewer Line Replacement at Middlesex High School
Renovation
Results
Middlesex, NJ 08846

Auditorium Renovations at Carteret High School
Renovation
Results
Carteret, NJ 07008

Renovations to Three Perth Amboy Public Schools
Renovation
Construction
$1,719,000 est. value
Perth Amboy, NJ 08861

Last Updated 02/16/2022 11:47 AM
Project Title

Renovations and Alterations at Dunellen High School

Physical Address View project details and contacts
City, State (County) Dunellen, NJ 08812   (Middlesex County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of Project is defined by the Contract Documents and generally consists of but not the to the following: 1. Renovations to the Main Office Suite, VP Office Suite, Guidance Office Suite, Gymnasium and Weight Room at the Dunellen High School, 2. Alterations to the Cafeteria, Kitchen, Music Room, Auditorium, and Wood Shop at the Dunellen High School, 3. HVAC, plumbing and electrical renovations at the Dunellen High School.

Details

Middle/Senior High School, Renovation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents