Similar Projects
Northeast Metropolitan Regional Vocational School
New Construction, Infrastructure - 382,610 SF
Sub-Bidding
$249,000,000 CJ est. value
Wakefield, MA 01880

Framingham District Court - Renovation - Sub
Renovation
Sub-Bidding
$4,093,126 CJ est. value
Framingham, MA 01702

Wastewater Treatment Facility Phase 2 Upgrades
Alteration
Post-Bid
$11,600,000 est. value
Hudson, MA

Replace HVAQC System Brigade HQ Building 102 - SUB Bid
Alteration
Post-Bid
$1,000,000 est. value
MA

Remove, Furnish and Install a New Air Compressor at Fire Station 1
Alteration
Results
$95,000 est. value
Dracut, MA 01826

Watertown Middle School - Second Floor HVAC Upgrade - General Bid
Alteration
Results
$1,400,000 est. value
Watertown, MA 02472

Police H.V.A.C. Repair Project
Renovation
Construction
$89,932 CJ est. value
North Reading, MA 01864

Capen Court - Senior housing (667-1) Chiller Replacement
Renovation
Construction
$234,300 CJ est. value
Somerville, MA 02144

HVAC Trades Labor Projects
Term Contract
Sub-Bidding
$50,000 CJ est. value
Lowell, MA 01854

Replace HVAQC System Brigade HQ Building 102 - GC Bid
Alteration
Post-Bid
$1,000,000 est. value
MA

Boilers And Water Heaters Replacement
Renovation
Results
$100,000 CJ est. value
Concord, MA 01742

Auditorium RTU Replacement At Littleton High School
Renovation
Sub-Bidding
$250,000 CJ est. value
Littleton, MA 01460

Nashoba Valley Technical High School HVAC Controls Upgrade
Alteration
Post-Bid
$400,000 est. value
Westford, MA 01886

Chilled Water Piping Insulation Replacement, Donahue Hall - General Bid
Alteration
Results
$650,000 est. value
Lowell, MA 01854

Tyngsborough Police Station HVAC System Installation
Renovation
Sub-Bidding
$300,000 CJ est. value
Tyngsborough, MA 01879

Last Updated 10/10/2023 04:05 AM
Project Title

Housing Commission HVAC Improvements

Physical Address View project details and contacts
City, State (County) Lincoln, MA 01773   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Housing Commission HVAC Improvements - The Town of Lincoln Housing Commission is soliciting bids for the installation of installation of a variety of heat pump units at 7 properties throughout the community of Lincoln, MA. Project specifications are listed below, and total bid response should include the deduction all applicable Mass Save rebates, pending qualification. Prevailing Wage Rates apply and are included in the bid specifications. Estimated Cost $150,000 Questions regarding this bid may be submitted to Daniel Pereira, Asst. Town Administrator, in writing via email (pereirad@lincolntown.org) The Town of Lincoln Housing Commission is soliciting bids for the installation of installation of a variety of heat pump units at 7 properties throughout the community of Lincoln, MA. The winning bidder will provide, install and electrify equipment at the 7 addresses listed below as indicated: 1) 30 Sunnyside Lane, Lincoln MA 01773 - o Installation of one 5-ton Bosh heat pump with Bosh air handler along with all necessary equipment, line sets, control wire, electrical, permits, and labor. o Renovate existing ducts and install new insulation. o All equipment must be listed on the Mass Save Heat Pump Qualified Products List or be exchanged for the most comparable substitute. o Must be completed no later than December 15, 2023. 2) 75A Tower Rd Lincoln MA 01773 - o Installation of Mitsubishi hyper mini split system, one (1) 18,000 BTU heat pump condenser with one (1) 9,000 btu wall unit in living room kitchen area and one (1) 9,000 btu wall unit in bedroom, along with all equipment, line sets, control wire, electrical, permits, and labor. o All equipment must be listed on the Mass Save Heat Pump Qualified Products List or be exchanged for the most comparable substitute. o Must be completed no later than January 31, 2024. 3) 75B Tower Rd Lincoln MA 01773 - o Installation of Mitsubishi hyper mini split system, one (1) 36,000 BTU heat pump condenser with one (1) 15,000 BTU wall unit in 1st floor kitchen, one (1) 9,000 BTU wall unit in each 2nd floor bedroom, along with all equipment, line sets, control wire, electrical, permits, and labor. o All equipment must be listed on the Mass Save Heat Pump Qualified Products List or be exchanged for the most comparable substitute. o Must be completed no later than January 31, 2024. 4) 65 Tower Rd Lincoln MA 01773 - o Installation of one (1) 3-ton Bosh heat pump with Bosh air handler, along with all equipment, line sets, control wire, electrical, permits, and labor. o Renovate existing ducts and install new insulation. o All equipment must be listed on the Mass Save Heat Pump Qualified Products List or be exchanged for the most comparable substitute. o Must be completed no later than January 31, 2024 ) 26 Sunnyside Lane Lincoln MA 01773 - o Installation of Mitsubishi hyper mini split system, one (1) 36,000 BTU heat pump condenser with one (1) 15,000 BTU wall unit in 1st floor kitchen, one (1) 9,000 BTU wall unit in each 2nd floor bedroom, along with all equipment, line sets, control wire, electrical, permits, and labor. o All equipment must be listed on the Mass Save Heat Pump Qualified Products List or be exchanged for the most comparable substitute. o Must be completed no later than January 31, 2024. 6) 28 Sunnyside Lane Lincoln MA 01773 - o Installation of Mitsubishi hyper mini split system 1 18,000 BTU heat pump condenser with 1 9,000 btu wall unit in living room kitchen area and 1 9,000 btu wall unit in bedroom, along with all equipment, line sets, control wire, electrical, permits, and labor. o All equipment must be listed on the Mass Save Heat Pump Qualified Products List or be exchanged for the most comparable substitute. o Must be completed no later than January 31, 2024. 7) 30A Sunnyside Lane Lincoln MA 01773 - o Installation of Mitsubishi hyper mini split system, one (1) 18,000 BTU heat pump condenser with one (1) 9,000 btu wall unit in the living room kitchen area and one (1) 9,000 btu wall unit in bedroom, along with all equipment, line sets, control wire, electrical, permits, and labor. o All equipment must be listed on the Mass Save Heat Pump Qualified Products List or be exchanged for the most comparable substitute. o Must be completed no later than January 31, 2024.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents