Repair Runway Pavements
Design
$25,000,000 to $100,000,000 est. value
East Gaffney, SC

CHS Miscellaneous Airfield Pavement Repairs
Bidding
North Charleston, SC 29418

Rubber Removal and Paint Stripping
Bidding
$1,000,000 to $5,000,000 est. value
North Charleston, SC

Greenville Spartanburg International Airport (GSP) Airfield Pavement Improvements Program - Priority 1
Post-Bid
Greer, SC 29651

Nebo Church Road Relocation and West Apron Expansion
Results
Less than $2,101,783 est. value
Seneca, SC 29678

North Apron Reconstruction Project
Results
Less than $696,412 est. value
Pelion, SC 29123

Airport Taxiway and Apron Reconstruction
Results
$250,000 to $500,000 est. value
Saluda, SC 29138

Airport Apron Rehabilitation Project
Results
Lancaster, SC 29720

Taxilane and Apron Rehabilitation at Barnwell County Airport
Results
Barnwell, SC 29812

Chester Catawba Regional Airport Taxiway Pavement Rehabilitation
Results
Less than $1,014,610 est. value
Chester, SC 29706

Southwest Apron Expansion
Results
Orangeburg, SC 29115

Summerville Airport Apron Expansion Project
Results
Saint George, SC 29477

Construction of Hartsville Regional Airport FBO Terminal
Results
Hartsville, SC

Orangeburg Municipal Airport Expansion Project
Results
Orangeburg, SC 29115

Hilton Head Island Airport Commercial Apron Expansion
Results
Hilton Head Island, SC 29926

Last Updated 02/19/2020 08:43 AM
Project Title

Ridgeland-Claude Dean Airport Runway 18-36 Program - Phases 3 and 4

Physical Address View project details and contacts
City, State (County) Ridgeland, SC 29936   (Jasper County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bid Schedule No.1- Runway 18-36 Program: Phase 3A. This bid schedule completes the new 4200' x 75' Runway 18-36 and parallel taxiway system. Major work items include approximately: 28,000 cubic yards of onsite excavation, 1,710 tons of SC-403 Type B asphalt pavement, 7,000 square yards of 6” thick P-209 crushed aggregate base course, 530 linear feet of storm drainage pipe and structures, and 2,200 linear feet of chain link fence for Runway 36 safety overrun. Related work includes pavement demolition, markings, topsoil, grassing, erosion control, and electrical items such as runway edge lights, taxiway edge lights, REIL units, and signage. Bid Schedule No. 2 - Runway 18-36 Program: Phase 3B. This bid schedule includes construction of the remainder of Taxiway B, construction of widened Taxilane B1, new Taxilane B2, reconstructed Taxilane B3, and new Taxiway C. Major work items include approximately: 8,500 square yards of asphalt pavement removal, 7.5 acres of clearing and grubbing, 5,000 cubic yards of onsite excavation, 1,140 tons of SC-403 Type B asphalt pavement, 4,600 square yards of P-209 crushed aggregate base course, and 450 linear feet of storm drainage pipe and structures. Related work includes markings, topsoil, grassing, erosion control, and electrical items such as taxiway edge lights and signage. Bid Schedule No. 3 - Hangar Storm Drainage Improvements. Work shall be performed concurrently with Bid Schedule No. 1. Work includes construction of approximately 300 linear feet of new storm drainage inlets and pipes and roughly 350 square yards of regrading at existing hangars on the south side of the airport. Work also includes two small areas of pavement repairs, 10 tons of SC-403 asphalt pavement and 25 square yards of 6” thick SC-501 concrete pavement, in the existing hangar complex. Bid Schedule No.4 - T-Hangar Taxilane Apron Reconstruction. This work includes reconstruction of approximately 1,110 square yards of asphalt pavement adjacent to the T-Hangar near Grays Highway. Bid Schedule No. 5 - Terminal Aircraft Apron. This project generally consists of construction of a 202’ x 420’ wide apron with connector taxilane to Taxiway A. Major work items include: onsite excavation, drainage structure modification, 10,400 square yards of 6” thick P-209 crushed aggregate base course, 2,300 tons of SC-403 Type B asphalt pavement, taxiway edge lights, apron flood lighting, and reflective pavement markings. New apron will include tiedowns for parking 13 aircraft. Other related work includes topsoil, grassing, and erosion control. Bid Schedule No. 6 - Terminal Access Road, Parking and Utilities. This project consists of construction of a terminal public access roadway and parking lot for a future terminal building at the Airport. This bid schedule covers the construction of a new two-lane access road connecting to Grays Highway and ending at the new terminal parking lot. Major Work items in the construction of a 32-space parking lot include: onsite excavation, new drainage structures and pipes, 1,200 linear feet of curb and gutter, 5,000 square yards of 6” thick crushed aggregate base course, 2,100 square feet of concrete sidewalk, 960 tons of SC-403 Type B asphalt pavement, 2 automatic sliding gates with operators, installation of new water line extension, new sanitary sewer pump station, force main, and a 8-inch gravity sewer system. Other related work includes erosion control, marking, and area lighting for the parking lot.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents