Similar Projects
Chiller Replacement - Horizonte Instruction and Training Center
Renovation
Sub-Bidding
$400,000 CJ est. value
Salt Lake City, UT 84101

Chiller Replacement - North Star Elementary School
Renovation
Sub-Bidding
$400,000 CJ est. value
Salt Lake City, UT 84116

SD 100/160 HVAC Overhaul Kits
Alteration
Post-Bid
Salt Lake City, UT

Canterbury Furnaces
Alteration
Post-Bid
Salt Lake City, UT

USU Eastern Chiller Relacement Project
Results
Logan, UT

HVAC Installation
Results
$100,000 to $250,000 est. value
Tooele, UT

Riley Elementary Chiller Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Salt Lake City, UT 84104

Salt Lake City ATCT CRAC Unit Upgrades
Term Contract
Post-Bid
Salt Lake City, UT

HVAC Upgrade, Ft Duchesne, UT
Results
Fort Duchesne, UT 84026

Salt Lake County Mountain America Exposition Center Cooling Towers Media Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
Sandy, UT 84070

HVAC and Plumbing
Term Contract
Post-Bid

Removal and Replacement of HVAC System
Results
Tooele, UT 84074

Jordan Campus Plate Exchanger - Free Cooling
Renovation
Sub-Bidding
$189,000 CJ est. value
West Jordan, UT 84088

Air Filters
Alteration
Post-Bid
Ephraim, UT 84627

J041--660 - (S4) ** EMERGENT** Air Handler Repair Bldg 2 AHU Repairs
Term Contract
Results
Salt Lake City, UT 84148

Last Updated 12/07/2022 05:53 AM
Project Title

Ogden School for the Deaf and Blind Main Campus Cooling Tower Replacement

Physical Address View project details and contacts
City, State (County) North Ogden, UT 84404   (Weber County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $122,084 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

ONLY FIRMS PRE-QUALIFIED DURING STAGE I OF THE RFS ARE ALLOWED TO BID ON THIS PROJECT The project includes replacement of existing 500 ton two cell cooling tower with a single cell 250 ton cooling tower with piping stubs for a future cooling tower addition. Question Submission Close Date 11/22/2022 3:00 PM MST

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents