Similar Projects
Carnahan Canal Renovations at Witte Museum
Renovation
Design
San Antonio, TX 78209

VA - Traffic Control Devices
Infrastructure
Bidding
$1,488,684 est. value
TX

Doniphan Traffic Signals-Capital Improvements
Infrastructure
Bidding
$600,000 to $900,000 est. value

HEB - Turn Lane Improvements
Post-Bid
San Antonio, TX

Clearwater Creek Phase 1A Single-Family Residential Development - Water, Sanitary Sewer, Street and Drainage Improvements
New Construction
Post-Bid
Marion, TX 78124

San Antonio Parking Lot Asphalt Paving
Term Contract
Results
Less than $85,311 est. value
San Antonio, TX 78223

North Main Avenue and Soledad Street (Pecan Street to Navarro Street)
Results
$8,008,856 est. value
San Antonio, TX 78200

2022 Oakwell Farms Street Maintenance
Infrastructure
Bidding
TX

SW Clinic Re-Pavement Project
Renovation
Post-Bid
San Antonio, TX 78237

VMC Asphalt Parking Lots Improvements
Results
San Antonio, TX 78212

Street Maintenance Year 5
Infrastructure
Bidding
$240,000 est. value
Leon Valley, TX 78240

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Braun Road Sidewalks
Results
$1,100,000 est. value
San Antonio, TX 78200

Houston Drive - Universal City Economic Development Corporation
Infrastructure
Post-Bid
Universal City, TX 78148

Construct 2 Way Lt Turn Ln, Bike Lns and Sdwks
Results
Less than $13,629,893 est. value
TX

Last Updated 05/02/2022 08:29 AM
Project Title

South Presa Street (SE Military to W. Boyer)

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78275   (Bexar County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Storm/Sewers, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $13,808,700
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will provide pedestrian connectivity by reconstructing sidewalks, driveways, and curbs from W. Boyer to SE Military Drive. The street will be reconstructed and restriped to include 5 ft. bike lanes from SE Military to Monticello. Traffic signals will be upgraded at Whittier, Steve’s Ave., Zapata and Fair, Southcross and Riverside Dr. Also included with this project are storm drain improvements and joint-bid utility improvements by SAWS and CPS.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents