Similar Projects
Stoneridge Parcel 58 Bike Trail - Miner's Ravine to Orvietto Drive - 500262 - City of Roseville
Infrastructure
Conception
$2,330,000 est. value
Roseville, CA 95678

Stoneridge Parcel 58 Bike Trail - Miner's Ravine to Orvietto Drive - 500262 - City of Roseville
Infrastructure
Conception
$2,330,000 est. value
Roseville, CA 95678

AutoZone #5004 / Roseville
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Roseville, CA 95747

AutoZone #5004 / Roseville
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Roseville, CA 95747

Bickford Ranch LDR 19 Joint Trench
Infrastructure
Bidding
$250,000 CJ est. value
Lincoln, CA 95648

Northwest Rocklin Sewer Annexation Construction
Infrastructure
Bidding
$990,000 CJ est. value
Rocklin, CA 95677

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Bickford Ranch Backbone Concrete
Alteration
Post-Bid
Lincoln, CA 95648

County of Placer - 2021 Roadway Surface Treatments
Alteration
Results
CA

2021 Roadway Hot Mix Asphalt Overlay Project
Infrastructure
Results
$1,700,000 est. value
CA

Atkinson Self-Storage
New Construction, Infrastructure - 26,625 SF
Pending Verification
$3,000,000 CJ est. value
Roseville, CA 95678

Atkinson Self-Storage
New Construction, Infrastructure - 26,625 SF
Pending Verification
$3,000,000 CJ est. value
Roseville, CA 95678

Fiddyment Road Repaving Project - City of Lincoln
Alteration
Conception
$6,237,050 est. value
Lincoln, CA 95648

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Install Cured-In-Place Pipeliners in Placer County
Infrastructure
Bidding
$210,000 CJ est. value
Auburn, CA 95603

Last Updated 08/18/2022 06:06 AM
Project Title

Reconstruct Runway 15-33 - 230 - City of Lincoln

Physical Address View project details and contacts
City, State (County) Lincoln, CA 95648   (Placer County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $9,312,500 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Runway 15-33 is nearing the end of its service life and requires complete reconstruction. The pavement is weathering and cracks have developed due to thermal expansion and contraction. The pavement maintenance analysis conducted in 2008 and updated in 2015 indicated that the pavement on the runway has a remaining life of 2 to 3 years with forecast traffic. This is an ongoing project which does not require additional funding in 2022-2023. As of August 18, 2022, this project is currently in the FY 2022-2026 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents