Similar Projects
Stormwater Detention Basin Rehabilitation
Bidding
Less than $100,000 est. value
Tewksbury, MA 01876

32 South Main Street Storm Sewer Replacement and Parking Lot
Bidding
Less than $200,000 est. value
Uxbridge, MA

Police Station Storm Water Improvements
Post-Bid
Milton, MA

Inflow Removal Program - Contract 6A
Post-Bid
Less than $1,500,000 est. value
Revere, MA

Sandwich Harbor Stormwater Mitigation Phases 1 and 2
Results
$480,000 est. value
Sandwich, MA

Emergency Repairs to Sewers and Drains City wide
Results
Less than $1,300,000 est. value
Boston, MA

2020 PFAS Mitigation Barnstable Municipal Airport
Bidding
Hyannis, MA 02601

Catch Basin Cleaning Throughout Town
Term Contract
Post-Bid
$95,000 est. value
Belmont, MA

CCTV Sewer Pipeline Rehabilitation
Results
Less than $100,000 est. value
Franklin, MA

Public Water Line Extension and Residential Connections on a Section of Bennett Street
Bidding
Less than $2,419,000 est. value
Wrentham, MA 02093

Roadway Structures Adjust/Rebuild
Post-Bid
Less than $50,000 est. value
Tewksbury, MA 01876

Manhole Rehabilitation Project
Results
Less than $199,550 est. value
Abington, MA

PVC Storm Drain Pipe
Post-Bid
Dartmouth, South Dartmouth, MA 02748

Clean/Television Inspection of Sewers Citywide
Results
Less than $550,000 est. value
Boston, MA

Manhole and Catch Basin Adjusting Rings, Catch Basin, Double Catch Basins and Manhole Frames and Grates, Corrugated Polyethylene Tubing and Fittings
Post-Bid
Holden, MA

Reported 04/24/2019 10:08 AM
Project Title

Sewer and Drain Condition Monitoring in the City of Boston

Physical Address View project details and contacts
City, State (County) Boston, MA   (Suffolk County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value $503,046
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Sewer and drain condition monitoring in the City of Boston. Includes the cleaning and inspection of approximately 71,900 feet of 6-inch to 60-inch circular and 12-inch by 16-inch to 90-inch by 132-inch non-circular sanitary sewers, combined sewers and drain pipes throughout the City of Boston. Approximately 56,750 ft. of pipe are preselected areas in the City Proper and South End neighborhoods.
Details
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents