Similar Projects
New Hope Academy Expansion
Build-Out - 9,600 SF
Design
Arlington Heights, IL 60004

Transition Program Tenant Buildout
Build-Out
Bidding
$353,000 est. value
Libertyville, IL 60048

Alterations of the Junior High School Restrooms
Renovation
Bidding
$200,000 est. value
Piper City, IL 60959

2021 Washroom and Life Safety Work
Renovation
Post-Bid
Palatine, IL 60067

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

CM at Risk - Partial High School Replacement and Junior High School/High School Renovation
Renovation
Results
Toulon, IL 61483

Old Orchard Junior High School - Corridor Code Compliance - BP #1 - General Trades
Results
Skokie, IL 60076

High School Gym Replacement at Argenta-Oreana High School
Addition - 16,187 SF
Construction
Less than $4,200,000 est. value
Argenta, IL 62501

West Oak Campus Maintenance Building
New Construction, Demolition
Bidding
Mundelein, IL 60060

2021 Summer Work
Renovation, Addition
Post-Bid
Winnetka, IL 60093

The Backstage and Wrestling Room Renovations, and Outdoor Classroom and Admin Entry
Renovation
Results
Farmington, IL 61531

2022 Maintenance Building Project
New Construction
Bidding
$200,000 est. value
Yorkville, IL

Summer 2021 Improvements at Palombi MS
Post-Bid
Lake Villa, IL

2021 Life Safety Implementation
Results
Kangley, Streator, IL 61364

2021 Classroom Upgrades at the Middle School
Renovation
Post-Bid
Mundelein, IL

Reported 04/16/2022 12:00 AM
Project Title

2022 Construction is an Addition to the Existing High School

Physical Address View project details and contacts
City, State (County) Champaign, IL   (Champaign County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Board of Education for the Unity CUSD 7 is seeking bids for the 2022 Construction Project which is an addition to the existing High School. The following is a list of the different scopes of work to bid on this project. General Trades, Painting/Epoxy floors Doors and Hardware, Concrete/Site work, Structural steel, Flooring, Cabinetry, Masonry.

Details

Middle/Senior High School, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents