Similar Projects
2020 Pedestrian Safety - Vision Zero
Alteration
Bidding
$2,514,815 est. value
San Antonio, TX 78283

Borchers Drive Reconstruction from Deer Grove Drive to Ackerman Road
Infrastructure
Bidding
$545,000 est. value
Kirby, TX 78219

Ring Road Bent Repairs
Post-Bid
Less than $189,365 est. value
San Antonio, TX

Oakwell Farms 2019 Trail Reconstruction
Post-Bid
San Antonio, TX

Blanco Road Phase II
Results
$19,200,000 est. value
San Antonio, TX 78207

Southern Region Disaster Recovery Support BPA
Results

IH0410 - Crack Seal
Infrastructure
Bidding
$264,510 est. value
TX

2019 Oakwell Farms Mill and Overlay Phase I
Post-Bid
Less than $420,000 est. value
TX

Repair Stanley Road
Results
$1,000,000 to $5,000,000 est. value
San Antonio, TX 78234

US 281 - Intersection Improvements with Right and/or Left T
Infrastructure
Bidding
$5,070,579 est. value
TX

2020 Street Improvements Phase II Eaglecrest Boulevard
Post-Bid
Windcrest, TX 78239

Converse Greenway Trail Phase 1
Results
Converse, TX 78109

SL 1604 - Widen Road - Add Lanes
Infrastructure
Bidding
$260,213,404 est. value
TX

Concrete Paving or Repairs
Post-Bid
Live Oak, TX 78233

Bynum Avenue (West Gerald Avenue to South West Military Drive)
Results
Less than $5,773,331 est. value
San Antonio, TX 78211

Reported 05/29/2021 12:00 AM
Project Title

Repair, Repave C St East Full Depth

Physical Address View project details and contacts
City, State (County) Randolph Air Force Base, TX   (Bexar County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors capable of providing roadway paving at the estimated project magnitude and capable of obtaining the appropriate aggregate and per project bonding to execute task orders for roadway paving across JBSA-Randolph. The objective of this project is a design build for full depth repair of Portland Cement Concrete (PCC) road (47,000 SF), re- stripping and pavement markings, curb, gutter and sidewalk repairs. These repairs include maintaining existing drainage patterns, protecting, and keeping existing underground utility structures at JBSA-Randolph AFB.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents