Similar Projects
Mississippi River Water Re-Introduction into Bayou Lafourche
Infrastructure
Bidding
Thibodaux, LA

Water Treatment Services-LDH
Infrastructure
Bidding
Iota, LA 70543

2020 PUA CWEF Grant Improvements Altitude Valve at Elevated Storage Tank
Infrastructure
Post-Bid
Less than $65,000 est. value
Donaldsonville, LA

Saint Bernard Drinking Water Revolving Loan Fund Waterline Replacement
Infrastructure
Post-Bid
Chalmette, LA

Hoyle Creek Partial Force Main Replacement
Results
Lincolnton, NC 28092

John Hopkins Sewer Force Main Replacement
Infrastructure
Results
$707,900 est. value
Kenner, LA

Magnolia Chase Force Main and Lift Station Improvements
Renovation, Infrastructure
Bidding
Benton, LA

Collection and Distribution Pipe and Fittings
Infrastructure
Post-Bid
Lake Charles, LA

On-Call Water Valve Operation Services
Infrastructure
Results
New Orleans, LA

US 190 Pump Station Force Main Upgrade
Infrastructure
Bidding
Covington, LA

WW Collection System Rehabilitation Cured in Place Pipe
Infrastructure
Post-Bid
Lafayette, LA

43 Watermain Replacement
Infrastructure
Results
Less than $12,895,874 est. value
New Orleans, LA

Annual Parishwide Wastewater Collection System Emergency Repairs Project
Term Contract, Infrastructure
Bidding
Baton Rouge, LA

Improvements to Causeway Boulevard and Scott Street Sewer Lift Station
New Construction, Infrastructure
Post-Bid
Gretna, LA

Bayou Saint John, Fairgrounds, Seventh Ward Group E (FRC)
Infrastructure
Results
New Orleans, LA

Reported 03/16/2022 12:00 AM
Project Title

Phase 2 Installation of New Owner Furnished AMR Water Meters

Physical Address View project details and contacts
City, State (County) Lake Charles, LA   (Calcasieu County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of the removal of approximately 645 existing water meters with the replacement installation of new owner furnished AMR Water Meters, backflow prevention valves, fittings, and other appurtenances.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents