Similar Projects
Berth 46 - Outer Harbor Cruise Terminal AMP - Port of Los Angeles
Infrastructure
Conception
$35,000,000 est. value
Los Angeles, CA

Berths 177-178 Wharf Restoration - Port of Los Angeles - Construction Division
Infrastructure
Conception
$11,400,000 est. value
Los Angeles, CA 90081

Reconstruct Drainage
Infrastructure
Design
$4,164,000 est. value
Willits, CA 95490

Storm Water Mitigation
Infrastructure
Design
$5,056,000 est. value
Placentia, CA 92870

Bon Air Road Bridge Replacement Offsite Mitigation Projects
Infrastructure
Bidding
$2,500,000 to $2,800,000 est. value
Larkspur, CA 94939

Panther Gap Road PM 0.50 Storm Damage Repair Project
Infrastructure
Bidding
$2,844,580 est. value
CA

Locating Subsurface Facilities
Alteration
Post-Bid
Riverside, CA 92519

Gregory Gardens Storm Drain Rehabilitation
Infrastructure
Post-Bid
$1,320,000 to $1,320,000 est. value
Pleasant Hill, CA 94523

San Andreas Road PM 1.24 and 1.30 Browns Valley Road PM 2.14 and Mt Madonna PM 0.96 Storm Damage Repair Project
Infrastructure
Results
San Andreas, CA

Sewer Main Spot Repair
Alteration
Results
$650,000 est. value
Whittier, CA 90603

Sub-basin BD Drainage Ditch - 50280 - City of Chico
Infrastructure
Conception
Less than $266,845 est. value
Chico, CA 95927

Helix 9 Flow Control Facility
New Construction, Infrastructure
Design
$6,000,000 to $8,000,000 est. value
San Diego, CA

2022 Geotechnical Hazard Abatement District (GHAD) Maintenance Services
Infrastructure, Alteration
Bidding
$70,000 est. value
Pleasanton, CA

Shoemaker Avenue Trunk Sewer Rehabilitation
Alteration
Post-Bid
$750,000 to $1,250,000 est. value
Norwalk, Santa Fe Springs, CA 90659

Interstate 10 Sewer Crossing
Infrastructure
Results
Yucaipa, CA 92399

Reported 07/12/2022 02:45 PM
Project Title

Rich Hill Drive Storm Drain Improvement - Sacramento County

Physical Address View project details and contacts
City, State (County) Orangevale, CA 95662   (Sacramento County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Design Development, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $1,158,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will improve drainage on the streets in the vicinity of the Rich Hill Drive/ Chestnut Avenue intersection. The storm drain system is comprised of undersized mainlines and drains that clog with debris or get overwhelmed due to limited capacity. The project will install larger mainlines and inlets to replace and supplement the existing drainage facilities As of July 11, 2022 , this project is currently in the FY 2022-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for Fiscal Year 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents