Similar Projects
Non-Potable Reservoir Pump Station
Post-Bid
Brighton, CO 80601

Marcy Gulch Lift Station Project
New Construction
Post-Bid
Highlands Ranch, CO 80129

Grandview Pump Station Phase I: Building Improvements and/or Phase 2 and Site Improvements Projects
Renovation
Results
Durango, CO 81301

Lift Station Pump Replacement
Results
Denver, CO 80202

Glenview Owners` Association Booster Pump Station
Construction
Less than $420,000 est. value
Buena Vista, CO

Binney Connection Project Treatment and Pumping Package
New Construction
Post-Bid
$19,000,000 est. value
Aurora, CO 80010

Smoky Hill Pump Station Improvements
Results
$3,200,000 to $3,670,000 est. value
Aurora, CO 80012

Lift Station A And Force Main Project
Post-Bid
Northglenn, CO 80241

Gun Club Road Pump Station Major Improvements Project
Results
$5,000,000 to $5,400,000 est. value
Aurora, CO

The Lakes at Centerra Metropolitan District Lakes Phase 7 Non-Potable Pump House
Post-Bid
Loveland, CO 80537

Ridgegate First Street Lift Station
Results
Lone Tree, CO

Waterbury Lift Station 2019 Repairs
Post-Bid
Centennial, CO 80011

Oak Grove Elementary School Christmas Break Sewage Lift Station Upgrade Project
Results
Montrose, CO

On-Call General Construction Services
Term Contract
Post-Bid
Brighton, CO 80601

Lift Station Upgrades Project in Greenwood Village
Results
Less than $1,544,555 est. value
Greenwood Village, CO

Last Updated 09/22/2020 06:03 PM
Project Title

Eccv Office Expansion

Physical Address View project details and contacts
City, State (County) Aurora, CO 80016   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New interior remodel work to portions of existing office areas, as well as, constructing two small building additions on each end of the existing Administration Building. The existing office building is an approximately 15,100 G.S.F. one-story structure with an existing approximately 3,621 G.S.F. basement area. The total area of interior renovations will be approximately 4,196 N.S.F. The north building addition will be approximately 2,393 G.S.F. and the south building addition will be approximately 1,689 G.S.F. to total 4,082 G.S.F. and bringing the total building footprint to 19,182 G.S.F. Interior remodel work will consist of the relocation of the existing Men’s and Women’s Locker Rooms, expanding the Break Room, adding an I&C Area, Water Quality Lab, Mudroom and airlock Vestibule, as well as, re-configuring some office / conference room spaces. The proposed new north building addition will include some private Offices, a Work Room, and the expansion of the Customer Service Office area. The proposed new south building addition will include the expansion of existing Office spaces. Both building additions will be one story wood framed construction to tie into and match the existing building in height, materials and colors.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents