Similar Projects
Taylor Street Railroad Drainage Repair
Infrastructure
Bidding
SC

Pipe Cleaning and Lining
Post-Bid
Columbia, SC 29202

Campus Village Residential Development - South Tunnel Stabilization
Post-Bid
$600,000 to $800,000 est. value
Columbia, SC 29208

Clean Pipes and Catch Basins on Parker
Term Contract
Results
Columbia, SC 29202

Lower Saluda River Relief Sewer Rehabilitation
Results
Columbia, SC

Danbury Drive Drainage Improvements
Post-Bid
SC

Stormwater System Repair Services
Results
Columbia, SC

Morris - Bryan Energy Center Drainage Improvements
Infrastructure
Post-Bid
$100,000 to $120,000 est. value
Columbia, SC 29203

Underground Detention Repair/Replacement - Westwood High
Results
Blythewood, SC 29016

Headquarters - Water Intrusion Remediation
Infrastructure, Alteration
Post-Bid
$100 to $200 est. value
Columbia, SC 29210

Removal of Sediment by truckload from the East Fork of the Chattooga River at the Walhalla Fish Hatchery
Results
Columbia, SC

Shoreline Stabilization- Sadlers Creek
Infrastructure
Post-Bid
$200,000 to $225,000 est. value
Columbia, SC 29201

Knollwood and Planters Drainage Improvements
Results
Columbia, SC

Falling Springs Cave-In Improvement
Infrastructure
Results
SC 29203

Artificial Reef Construction
Infrastructure
Results
Columbia, SC

Last Updated 12/02/2021 11:51 PM
Project Title

8" Sewer Main Relocation and Storm Drainage Improvements at 2511 Clark Street (SS7558/SD8496) MPP

Physical Address View project details and contacts
City, State (County) Columbia, SC 29201   (Richland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work called for by these specifications consists of furnishing all labor, equipment, materials and appurtenances required to perform all operations in connection with the construction of the New 8” Gravity Sewer Main, 24” RCP Storm Drainage Pipe, and as follows: 1. Connect New 8” Gravity Sewer Main to Existing 8” Gravity Sewer Main at two (2) locations. 2. Construct New 8” Gravity Sewer Main of varying lengths and New Sewer Manholes. 3. Construct New 24” RCP Storm Drainage and Catch Basins. 4. Installation of Flowable Fill within the Trench Areas located under Pavement. 5. Resurfacing of Trench Areas within existing Asphalt Pavement Areas. 6. Landscape and Driveway (Asphalt/Concrete) Repairs/Replacements. 7. Restoration as noted and as required. Location: 2511 Clark Street Columbia, South Carolina 29201.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents