Similar Projects
Reboot Center Furniture
Term Contract
Bidding
Tahlequah, Tulsa, OK 74107

Reboot Center Furniture
Term Contract
Bidding
Tahlequah, Tulsa, OK 74107

H52 System Furniture
Post-Bid
Oklahoma City, OK

CHI Update Mobile Supply Shelving System
Post-Bid
Claremore, OK

B3001 Office Reconfiguration
Term Contract
Results
Oklahoma City, OK 73145

B52 Office Furniture
Alteration
Results
Oklahoma City, OK 73145

137th PA Furniture and Office Space Design
Term Contract
Post-Bid
Oklahoma City, OK

Replacement Seating for Mckee Library Auditorium
Alteration
Post-Bid
Stillwater, OK

B2283 Office Remodel - Haworth Systems Furniture
Term Contract
Post-Bid
Oklahoma City, OK 73145

B244 Office Furniture
Term Contract
Post-Bid
Oklahoma City, OK 73145

Tulsa Office Furniture
Term Contract
Post-Bid
Tulsa, OK 74133

Office Furniture for North Hall Academic Building
Alteration
Post-Bid
Tulsa, OK 74107

Reported 11/17/2021 12:00 AM
Project Title

Furniture for Arts Center

Physical Address View project details and contacts
City, State (County) Broken Arrow, OK 74012   (Tulsa County)
Category(s) Single Trades
Sub-Category(s) Furnishings
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This specification covers furnishing and delivery, touch-up and repair or replacement of the items specified to the facility, unloading, assembling, leveling, completely installing and removing all crating, wrapping, etc. from the premises. Storage, loading, and unloading at the jobsite is the sole responsibility of the successful Vendor on items involved. Furnishings are to be distributed and placed in the individual buildings and rooms as designated in specifications and on floor plans. Temporary wall and floor protection shall be utilized while transporting furniture. All packaging and waste material incurred from unloading, unpacking, assembling, and installing shall be disposed of offsite and is the responsibility of the Vendor. The coordination of all unloading and installation activities to be established through the Owner’s Representative. Include all costs associated with freight, delivery, handling, and installation as a separate line item. Assume all responsibility and costs complying with Federal, State, and Local regulations for Equal Opportunity Employment, Anti-Discrimination, Safety, and other regulations. Include pricing for alternate installation scenario if Owner requests Vendor/Dealer to store furnishings for up to 45 days past installation due date if facility is not in a condition ready to receive furnishings. Include payment terms in proposal describing any and all deposits required for production to begin.

Details

Division 12 - Furnishings, Furniture.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents