Similar Projects
HMA Pavement and Pavement Marking
Infrastructure
Bidding
WI

Intersection
Infrastructure
Bidding
WI

Traffic Calming Improvements
Renovation
Post-Bid
Less than $535,000 est. value
Fitchburg, WI 53575

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Boardwalk Replacement
Results
De Forest, WI 53532

Stoughton - Madison, STH 138 to Silverado Drive / Hoel Avenue; Stoughton - Madison, Roby Road Intersection
Infrastructure
Bidding
WI

2021 Road Work on North Road
Post-Bid
Blue Mounds, WI

Nine Springs Valley Interceptor Improvements - McKee Road to Dunn`s Marsh
Results
Fitchburg, Madison, WI 53719

WHA Transmitter Utility and Boardwalk Replacement
Infrastructure, Alteration
Bidding
$360,000 est. value
Madison, WI

Benton Street Reconstruction
Post-Bid
Rockdale, WI 53523

Crack Routing and Sealing
Results
Madison, WI 53703

Monona Terrace Loading Dock and Parking Area Repair
Infrastructure
Bidding
Madison, WI

Road Work
Post-Bid
Verona, WI

I-39 - Columbus, North Street to School Street
Results
Columbus, WI 53925

Last Updated 08/09/2021 10:34 AM
Project Title

Summit Maintenance Facility Improvements 2021

Physical Address View project details and contacts
City, State (County) Madison, WI   (Dane County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $198,635
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of resurfacing of the asphalt maintenance yard at Parks’ Summit West Maintenance Facility. Work includes removing the existing curb and gutter, pulverizing the existing asphalt, installing new concrete curb and gutter, making grading improvements, and installing a new layer of asphalt pavement.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents