Similar Projects
Worden Park-East Playground - City of Royal Oak
Renovation, Infrastructure
Conception
$300,000 est. value
Royal Oak, MI 48073

Sanitary Sewer Capacity Upgrades And Pump Station Rehabilitation - WTS044 - City of Novi
Renovation, Infrastructure
Conception
$2,405,350 est. value
Novi, MI

Novi Medical Building
New Construction, Infrastructure - 2,558 SF
Design
$1,486,198 CJ est. value
Novi, MI 48377

Bebb Oak Meadows Mixed-Use
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Rochester Hills, MI 48307

Waldon Road Office & Service Building
New Construction, Infrastructure - 7,800 SF
Bidding
$1,900,000 CJ est. value
Clarkston, MI 48346

West Bloomfield Township Police Department Renovation and Expansion
Addition, Demolition, Renovation, Infrastructure
Bidding
$4,500,000 CJ est. value
West Bloomfield, MI 48323

CDBG ADA Sidewalk and Ramp Installation Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Milford, MI 48381

Farmington High School Site and Building Improvements
Infrastructure
Post-Bid
Farmington, MI 48336

West Bloomfield Civic Center Emergency Access Drive Project
Results
$143,536 est. value
MI 48323

Cemetery and Volunteer Park Grading Project
Results
$115,000 est. value
South Lyon, MI

La Salette Multi-Family Development - The Ivy
Infrastructure, Renovation - 22,923 SF
Construction
$5,000,000 CJ est. value
Berkley, MI 48072

Pella-Dar Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Royal Oak, MI 48067

Zeenat Plaza
New Construction, Infrastructure - 21,421 SF
Pending Verification
$11,000,000 CJ est. value
Rochester Hills, MI 48307

Pedestrian Tunnel Replacement (underneath South Lakeshore Drive) - Lakeshore Park - ENG084 - City of Novi
Alteration
Conception
$507,530 est. value
Novi, MI 48377

Camden Crossing Condos
New Construction, Infrastructure
Design
$9,500,000 CJ est. value
Rochester Hills, MI 48309

Last Updated 11/23/2022 11:03 AM
Project Title

8 Mile Pump Station Relief Force Main

Physical Address View project details and contacts
City, State (County) Pontiac, MI 48342   (Oakland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes construction of approximately 6,040 feet of 54-inch diameter sanitary sewer force main by open cut, and 2 air relief valve manholes in 8 Mile Road. Work includes reconstruction of two lanes of pavement in 8 Mile Road. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Labor and Materials Bond 100 % Question Acceptance Deadline 11/08/2022 05:00 PM EST Questions are submitted online No Two (2) new dry pit submersible wastewater pumps, each with a capacity of 6.4 CFS @ 14.4' TDH operating with a 15 HP motor, new control valves and piping, new duplex sump pump system, flushing system improvements, concrete rehabilitation of storage tank walls, miscellaneous improvements to existing heating, insulation, ancillary building components, and demolition and disposal required to perform the work as shown on the Drawings.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents