Similar Projects
Last Updated | 10/19/2021 10:28 AM |
Project Title | Dam 15 Shoreline Stabilization |
Physical Address | View project details and contacts |
City, State (County) | TX (Williamson County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $960,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The FLOOD PREVENTION DAM NO. 15 (TX01353) SHORELINE STABILIZATION PROJECT generally consists of the following Work: placing rock riprap and bedding shoreline protection along the upstream toe of the embankment section; placing compacted fill along 200 feet of the upstream toe of dam to improve drainage and eliminate ponding of water; demolition and removal of the abandoned early warning system tower and float-valve installation; reconstruction of the U.S.G.S. vertical lake-level staff gauges; providing temporary traffic and pedestrian controls during construction on the site and within the adjacent right-of-way; installing temporary safety fencing and stormwater pollution prevention measures during construction and removing them when construction is complete; placing topsoil and revegetation of all disturbed areas. Dam No. 15 is located at Paloma Lake in northeast Round Rock. The site is located on Park property and no access coordination is required to visit the site for visual inspection. Note that no ground disturbance of any kind is allowed including staking or vehicular access. A site visit is recommended. |
||||||
Details | Dam/Tunnel, New Construction.
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |