Similar Projects
Hawaiian Bros.
Renovation - 4,000 SF
Design
Addison, TX 75001

Architecture and Engineering Environmental Services for The United States Air Force (Ae Es 2020)
Post-Bid

Architecture and Engineering Environmental Services for The United States Air Force (Ae Es 2020)
Post-Bid

Houston Ship Channel, Mid Bay Placement Area (PA) Improvements
Results
$5,000,000 to $10,000,000 est. value
TX 77571

iHeart Media Austin
Renovation - 8,121 SF
Pending Verification
$770,000 est. value
Austin, TX 78746

Chocolate Bayou, Texas Construction
Post-Bid
$5,000,000 to $10,000,000 est. value
Brazoria, TX

Electrical Services
New Construction
Post-Bid

All Season Pre-Coated Patching Mixture (ASPPM)
Infrastructure
Post-Bid
TX

HCA Healthcare Almeda Free Standing Emergency Room
New Construction - 10,840 SF
Post-Bid
$4,500,000 est. value
Houston, TX 77085

Last Updated 10/19/2021 10:28 AM
Project Title

Dam 15 Shoreline Stabilization

Physical Address View project details and contacts
City, State (County) TX   (Williamson County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $960,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The FLOOD PREVENTION DAM NO. 15 (TX01353) SHORELINE STABILIZATION PROJECT generally consists of the following Work: placing rock riprap and bedding shoreline protection along the upstream toe of the embankment section; placing compacted fill along 200 feet of the upstream toe of dam to improve drainage and eliminate ponding of water; demolition and removal of the abandoned early warning system tower and float-valve installation; reconstruction of the U.S.G.S. vertical lake-level staff gauges; providing temporary traffic and pedestrian controls during construction on the site and within the adjacent right-of-way; installing temporary safety fencing and stormwater pollution prevention measures during construction and removing them when construction is complete; placing topsoil and revegetation of all disturbed areas. Dam No. 15 is located at Paloma Lake in northeast Round Rock. The site is located on Park property and no access coordination is required to visit the site for visual inspection. Note that no ground disturbance of any kind is allowed including staking or vehicular access. A site visit is recommended.

Details

Dam/Tunnel, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents