Similar Projects
Last Updated | 02/22/2021 03:43 PM |
Project Title | City of Plattsburgh - Arts Park |
Physical Address | View project details and contacts |
City, State (County) | Plattsburgh, NY 12901 (Clinton County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | General Construction A. General Requirements, survey and stakeout. B. Obtain Highway Work Permit from City of Plattsburgh DPW for work in city streets. C. Site demolition and removals. D. Furnish and install erosion controls. E. Earthwork and site grading including cut to fill subgrades, compaction and preparation of subgrade elevations. Furnish and install topsoil as required for landscaping. F. Perform utility trench and backfill for electrical and plumbing work. See other trades for plumbing and electrical work. Coordinate work with other trades. G. Furnish and install permeable concrete pavers, concrete and asphalt pavements, including subbase courses and geotextiles. H. Furnish and install concrete stairways and handrails. I. Furnish and install modular block walls. J. Furnish and install splash pad, including controller, splash pad features, play safe drain, LED lights, and concrete pavement. See other trades for splash pad plumbing and electrical work. Coordinate work with other trades. K. Furnish and install site furnishings, including tables, umbrellas, trash and recycling receptacles, benches, and tree pits. L. Furnish and install landscaping, including lawn establishment Electrical A. Electrical trench and backfill work shall be performed under the General Construction Contract. Not included in Electrical Contract. Coordinate this work with other trades. B. All electrical relocation or new service requires City of Plattsburgh Permits and can be obtained from the Plattsburgh Municipal Lighting Department (PMLD). After obtaining the necessary permits the project construction schedule shall be coordinated with PMLD within 72 hours advance notice for all work. C. Furnish and install site electrical work including; electrical wiring and conduit, hand holes, light poles and fixtures, light bollards, LED in-grade lights, and connections to existing electrical transformer and electric box. Plumbing A. Plumbing trench and backfill work shall be performed under the General Construction Contract. Not included in Plumbing Contract. Coordinate this work with other trades. B. All water and sewer relocation or new construction requires City of Plattsburgh Water and Sewer Permits and can be obtained from the City Building Inspector in coordination with DPW. After obtaining the necessary permits the project construction schedule shall be coordinated with DPW within 72 hours advance notice for all work. C. Furnish and install new stormwater management system including area drains, HDPE piping, connection to existing storm line and all fittings and accessories. D. Furnish and install new water supply system including cold water service to drinking fountain, yard hydrant and splash play controller, gate vales, drain valves, connection to existing water line, and all fittings and accessories. E. Furnish and install new sanitary sewer system including PVC piping, sanitary manholes, PVC drain lines from drinking fountain, |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |