Similar Projects
Last Updated | 08/19/2021 10:33 AM |
Project Title | Fire Academy HVAC Upgrades Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Concord, NH 03301 (Merrimack County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $200,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replace Existing Outdated Control System in the Dormitory Building, Fire House and Arffbuilding. The work will Primarily include the Replacement of Existing Controllers, the Incorporation of all Existing Controls Devices into the New Control System and Addition of a Small Number of Control Devices as Shown on the Contract Documents. The Facilitymanagement and Control System (FMCS) shall be based on the Niagara Framework,and Shall Be Fully Integrated into the Existing Fmcsofthe Administration Building, Located on the Same Campus. 901 Dormitory: Remove And Replace Control System With New Control System U 1.00 902 Firehouse: Remove And Replace Control System With New Control System U 1.00 903 Arff: Remove And Replace Control System With New Control System U 1.00 904 Allowance For Owner'S Changes For Unknown , Latent , or Differing Existing Conditions $ 10 ,000.00 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |