Similar Projects
New Stem Research Center
Post-Bid
$198,000,000 est. value
Storrs, CT 06269

Modular Clean Room
Post-Bid
Storrs, CT 06269

Public Safety Building Improvements
Addition - 3,500 SF
Results
Storrs, CT 06268

Horse Unit I and II Lorentzon Stables Upgrade
Results
Less than $188,250 est. value
Storrs, CT 06269

Torrey Life Science MCB Lab Renovations
Renovation
Post-Bid
Storrs, CT 06269

Hicks and Grange Student Room Renovations
Renovation
Results
$1,000,000 est. value
Storrs, CT 06269

On-Call General Contractor Services Set-Aside Program for Projects Estimated at Under $100,000
Post-Bid
Storrs, CT 06269

North Campus Residence Hall Renovations Phase II
Renovation
Results
Storrs, CT 06269

North Dining Dish Room Renovation
Renovation
Results
Storrs, CT 06269

Trade Labor Contractor for Academic Renovations
Renovation
Results
Storrs, CT

Kirby Mills First Floor Renovation
Renovation
Results
Mansfield, CT

West Campus Dorms Mechanical Room Repairs
Results
Storrs, CT

UCFM Code Remediation Hall Building
Results
Less than $100,000 est. value
Storrs, CT

Student Union Office Renovations
- 1,000 SF
Results
$100,000 to $500,000 est. value
Storrs, CT 06269

UPDC WALR Fiscal 2020
Results
Storrs, CT 06269

Reported 11/19/2019 08:44 AM
Project Title

Uconn Gant Building Renovations at Stem Phase 2

Physical Address View project details and contacts
City, State (County) CT   (Tolland County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $1,379,067
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Renovate approximately 285,000 SF of lab, office and mechanical equipment space in the existing Gant Building Facility, during multiple phases. The adjacent wings of the Gant Building Facility will be occupied during the Construction of each phase. This Phase 2 package is intended to renovate roughly 87,000 sf. The Phase 2 is anticipated to take place from July 2019 through December 2020. Total estimated value of the Phase 2 project is approximately $51.0 Million. Specific Trades: 01A.General Trades 01B.Final Cleaning 02A.Demolition & Abatement 03A.Concrete 04A.Masonry & Concrete Repairs 05A.Structural Steel 05B.Misc. Metals 06A.Laboratory Casework & Millwork 07A.Roofing 07B.Fireproofing 07C.Firestopping 08A.Glass and Glazing 09A.Carpentry & Drywall 09B.Flooring 09C.Tile 09D.Terrazzo 09E.Painting 10A.Signage 13A.Environmental Rooms 21A.Fire Protection 22A.Plumbing 23A.HVAC 23B.Building Automation 23C.Testing & Balancing 26A.Electrical 26B.Tele/Data 31A.Sitework The Gant Building Renovations Project will renovate approximately 285,000 SF of lab, office and mechanical equipment space in the existing Gant Building Facility, during multiple phases. The adjacent wings of the Gant Building Facility will be occupied during the Construction of each phase. This Phase 2 package is intended to renovate roughly 87,000 sf. The Phase 2 is anticipated to take place from September 2019 through February 2021. Total estimated value of the Phase 2 project is approximately $53.0 Million.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents