Similar Projects
2020 Street Resurfacing
Post-Bid
Ionia, MI

HMA Reconstruction, Storm Sewer, Concrete Curb and Gutter
Post-Bid
Ionia, MI 48846

Street and Utility Improvements - Washington Street and Dye Street
Results
Less than $1,362,523 est. value
Ionia, MI

0.40 MI of Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Curb and Gutter, Sidewalk, Sidewalk Ramps, Sewer, Drainage, Filler Walls and Pavement Markings
Results
Portland, MI 48875

Lakewood Wastewater Authority Phase 2 Collection System Improvements - Force Main Replacement
Post-Bid
Lake Odessa, MI 48849

0.48 MI of Construction of a Bypass Lane including Weigh-In-Motion Scale, Lane Designation Signal, Concrete Curb and Gutter, Sidewalk, Culverts, Drainage and Pavement Markings
Results
MI

M-21 (Lincoln Ave) Water Main, M-66 (State Street) to Baldie Street
Post-Bid
Ionia, MI 48846

15.62 MI of Overband Crack Fill, Single Course Chip Seal, Fog Seal, Longitudinal Joint Repairs, Aggregate Shoulders and Pavement Markings on M-89 from 56th Street East to M-40, M-79 from M-37 to Barry
Results

2020 County Wide Chip and Fog Seal and Crack Seal Program
Post-Bid
Ionia, MI

7.10 MI of Road Rehabilitation, Hot Mix Asphalt Cold Milling and Resurfacing, Aggregate Shoulders and Pavement Markings
Results
Hubbardston, MI 48845

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Center Street Reconstruction
Results
Saranac, MI

Central Division – Asphalt Paving Maintenance
Post-Bid

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Paving & Site Lighting
Post-Bid

Last Updated 02/28/2020 09:35 AM
Project Title

Ionia Correctional Facility Pavement Improvements

Physical Address View project details and contacts
City, State (County) Ionia, MI   (Ionia County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sewer force main improvements including new 10” main and grinding / screening equipment installation. Water system improvements including water well abandonment, installation of new 8” main, meter building construction and meter piping to support new municipal connection. Work includes underground vault installations, miscellaneous paving repairs and associated project restoration

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents