Similar Projects
Last Updated | 09/06/2022 11:31 PM |
Project Title | Athletics Locker Room Rehabilitation - Denny Farrell Riverbank State Park |
Physical Address | View project details and contacts |
City, State (County) | New York, NY 10031 (New York County) |
Category(s) | Entertainment/Recreation |
Sub-Category(s) | Misc. Recreational |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,864,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The estimate range for this project is $2,295,000.00 - $2,950,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. A general description of the primary work elements is listed below for reference. Contractor is responsible for reviewing all the drawings and specifications to obtain a complete understanding of the entire work scope. This contract includes all work indicated on the project documents, including but not limited to: 1. Mobilization and establishment of site perimeter fencing and maintenance and protection of existing conditions. 2. General demolition and removals of partitions, finishes and fixtures within the athletics locker room and restrooms. 3. Reconfiguration of the athletics locker room and restrooms to include one (1) new gender-neutral restroom. 4. Rehabilitation of the existing locker room to include new fixtures, finishes and equipment 5. Provide and install new finishes and fixtures within the limits of work. 6. Provide all necessary permits. Pursuant to Public Building Law 8(6), any contracts over $5,000 for the work of construction, reconstruction, alteration, repair, or improvement of any State building, a responsible and reliable NYS-certified Minority or Women-Owned Business Enterprise that submits a bid within ten percent of the lowest bid will be deemed the apparent low bidder provided that the bid is $1,473,245 or less (maximum amount has been adjusted for inflation effective January 1, 2022). If more than one responsible and reliable MWBE firm meets the requirements, the MWBE firm with lowest bid will be deemed the apparent low bidder. PROJECT COMPLETION The completion date for this project is 183 calendar days after agreement has been approved by the NYS Comptroller's Office. Project Specific Liquidated Damages (Refer to Article 14.10 of the General Conditions). $2,000.00 per Calendar Day Starting on the advertisement date, the Bidding and Contract Documents may be examined free of charge and obtained in person or by mail from Syed Shaukat at NYS OPRHP NYC Regional Office, 163 West 125th Street, 17th Floor, New York, NY 10027. In accordance with State Finance Law, Section 139-j, the following agency staff have been designated as contacts for this contract: Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 20% Women Owned Sub-Contracting Goal: 10% Service-Disabled Veteran-Owned Business Contracting Goal: 6%. |
||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |