Similar Projects
Gold Star Boulevard Bank
New Construction, Infrastructure - 5,000 SF
Design
$1,000,000 est. value
Worcester, MA 01606

Bituminous Concrete in Place
Post-Bid
Leicester, MA

Shared Streets Pedestrian Improvements Project
Post-Bid
Less than $200,000 est. value
Southbridge, MA

Complete Streets Project
Results
$525,000 est. value
Gardner, MA

Quabbin Aqueduct Shaft 2 Repairs
Results
Holden, MA

Shrewsbury Maple Retail Office
New Construction, Addition - 2,000 SF
Construction
Shrewsbury, MA 01545

Auburn Commerce Park Site Development
New Construction
Construction
Auburn, MA 01501

Millbury Street Apartments
Demolition, New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Worcester, MA 01607

Millbury Street Apartments
Demolition, New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Worcester, MA 01607

Bituminous Concrete
Post-Bid
Charlton, MA

Sidewalk and ADA Improvements at Various Locations
Results
$1,024,018 est. value

Henry Heywood Memorial Hospital Addition
Addition, Demolition, Infrastructure - 40,115 SF
Pending Verification
$37,960,521 CJ est. value
Gardner, MA 01440

Stone Seal, Double Stone Seal and 10% Asphalt Rubber Surface Treatment
Post-Bid
Charlton, MA

Sidewalk Reconstruction
Results
$612,892 est. value
Fitchburg, MA

Full Depth Reclamation (Calcium Chloride)
Post-Bid
Charlton, MA

Last Updated 09/15/2022 03:32 PM
Project Title

Pleasant Street and Smithville Road Improvements

Physical Address View project details and contacts
City, State (County) Spencer, MA 01562   (Worcester County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,914,650 [brand] Estimate
Plans Available from Civil Engineer - 08/10/22
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work is along Pleasant Street from Wire Village Road to High Street and Smithville Road from Pioneer Valley Road to Pleasant Street. The scope of roadway work includes, but is not limited to, full depth reclamation, full depth construction, pavement milling and overlay, minor box widening, closed drainage system improvements, hydrants and other related work, excavation and removal of unsuitable road material, furnishing and installing hot mix asphalt paving, removing and resetting existing granite curb, furnishing and installing new AAB/ADA compliant hot mix asphalt sidewalks and cement concrete wheelchair ramps, hot mix asphalt and granite curb, adjustment of existing drainage and utility structures to final grade, furnishing and installing compost filter tubes and silt sacks, new signs and pavement markings, providing traffic management, and other incidental work. Each Bid must be accompanied by a bid security consisting of a BID BOND, CASH, or CERTIFIED CHECK issued by a responsible bank or trust company in the amount of 5% of the bid price.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents