Similar Projects
Hononegah High School Bus Lane Reconstruction
Infrastructure
Bidding
Rockton, IL 61072

Replace 2 Box Culverts Carrying Gleasman Road Over Unnamed Creeks 0.80 Mile West of IL2, and 1/70 Miles East of IL 2
Infrastructure
Bidding
$500,000 est. value
IL

F.O.B. Co./Twp. Yard: Var. Pipe Culverts, Connect Bands, End Sections
Post-Bid
IL

Devon Avenue and Thomas Drive Drainage Improvements
Alteration
Post-Bid
Loves Park, IL

Gregory Heights Drainage Improvements Phase 1
Results
Less than $538,328 est. value
Rockford, IL 61104

City Hall Sidewalks, ADA, and Drainage Improvements
Results
Less than $76,000 est. value
Rockford, IL

Tennis Court Resurfacing at Guilford and Auburn High Schools
Renovation
Bidding
Rockford, IL 61114

Pipe Culvert
Infrastructure
Post-Bid
Rockford, IL

Jefferson High School Track
Results
Rockford, IL 61109

Latham & Bell School Culvert Replacements
Infrastructure
Bidding
$200,000 est. value
Rockford, IL 61105

Manhole Frames And Lids
Alteration
Post-Bid
Rockford, IL

Marsh School Playground Grading
Renovation
Results
Rockford, IL 61107

Human Services Playground Project (Fairgrounds)
Renovation
Bidding
$92,000 est. value
Rockford, IL

Hononegah High School Tennis Courts Expansion
Renovation, Infrastructure
Post-Bid
Rockton, IL 61072

Cherry Valley Township Pavement Resurface
Infrastructure
Results
Cherry Valley, IL

Last Updated 04/12/2022 11:35 AM
Project Title

Harmon Park Drainage Phase 8

Physical Address View project details and contacts
City, State (County) Rockford, IL 61108   (Winnebago County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $497,424
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of earth excavation of three excess flow drainage facilities, portland cement concrete sidewalks and driveways, combination concrete curb and gutter, hot-mix asphalt paving, storm sewer and structures, and the associated restoration and erosion control.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents