Similar Projects
B22 HVAC Repair
Term Contract
Bidding
$1,000,000 to $5,000,000 est. value
Clovis, NM

Construction of Berino Elementary School, HVAC Replacement
Alteration
Bidding
Anthony, NM 88021

Heating and Air Conditioning and Preventive Maintenance Services
Term Contract
Post-Bid
Carrizozo, NM 88301

Annual Chiller Maintenance Services
Term Contract
Post-Bid
$50,001 to $100,000 est. value
Farmington, NM 87402

HVAC Renovation of Building 1622
Renovation
Results
$1,000,000 to $5,000,000 est. value
NM

WSMR B1506 HVAC Renovation
Renovation
Results
$5,000,000 to $10,000,000 est. value
Alamogordo, NM

Elementary School HVAC Improvements
Alteration
Bidding
Mora, NM 87732

HVAC Chillers Replacement
Post-Bid
NM 88103

HVAC System Replacements
Results
Roswell, NM 88203

On Call Services for HVAC Repair Services
Term Contract
Bidding
Albuquerque, NM

H341--HVAC Test and Balance Needed for New Mexico VA Health Care System
Post-Bid
Albuquerque, NM

Eva B. Stokely Elementary School HVAC Upgrades 2020
Results
Shiprock, NM 87420

HVAC Filters
Post-Bid
Rio Rancho, NM 87124

Zuni Service Unit York Chiller Preventative Maintenance Agreement
Results
Zuni, NM

HVAC and Mechanical Products
Term Contract
Post-Bid

Reported 01/29/2022 12:00 AM
Project Title

B728, Repair HVAC, Cannon, AFB, NM

Physical Address View project details and contacts
City, State (County) Cannon Air Force Base, NM 88103   (Curry County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The 27 Special Operations Wing requires a design-build service to repair the HVAC at B728 on Cannon AFB, NM. Contractor’s will be provided a Concept Design (35%) and will be required to submit a 65%, 95% and a 100% design. Upon approval of the 100% design, construction will commence per the approved design. The requirement is to repair Building 728 HVAC system to include appropriate redundancy as specified in UFC 4-133-01 Air Traffic Control and Air Operations Facilities; special attention shall be paid to Chapter 3, Section 4, and Chapter 5. Project to include, but not limited to, design and construction of the following: removal and replacement of existing gas boiler and associated plumbing, demo and replace original ductwork with new, abate asbestos containing material insulating HVAC components, rewire thermostats and EMCS control components to new units, provide appropriate HVAC system redundancy, commission new system, patch and repair associated interior architecture as needed, and any other requirements as identified during the design process.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents