Similar Projects
Marymoor Stormwater Facility
New Construction
Conception
$900,000 est. value
WA

Vegetation Sorting Facility - sdbd12 - City of Auburn
Build-out
Conception
$152,000 CJ est. value
Auburn, WA 98002

Lake Hills Interceptor Corrosion Rehabilitation
Renovation
Design
$19,000,000 est. value
WA

South Plant Dewatering and Truck Loading Bay Ventilation Improvements
Renovation
Design
$1,300,000 est. value
WA

WWTP RAS Pumps Upgrade
Infrastructure
Bidding
$575,000 CJ est. value
Richland, WA 99352

Friday Harbor WWTP Improvements
Renovation
Bidding
$19,000,000 CJ est. value
Friday Harbor, WA 98250

Civil Structural Construction Work Order 2021-2022
New Construction
Post-Bid
$3,000,000 est. value
Seattle, WA

West Point Treatment Plant Capital Program Construction Work Order
New Construction
Post-Bid
$15,000,000 est. value
Seattle, WA

Interbay Forcemain and Odor Control Project
Renovation
Results
$1,100,000 est. value
WA

WWTP Digester 4
New Construction
Results
$13,244,000 est. value
Wenatchee, WA

Bujacich Sewage Lift Station 17 - City of Gig Harbor
Renovation, Infrastructure
Pending Verification
$1,900,000 CJ est. value
Gig Harbor, WA 98335

Digester Mixing Improvement Water Water Treatment Plant (WWTP) - WW0508 - City of Port Angeles
Renovation
Conception
$450,000 CJ est. value
Port Angeles, WA 98362

Cedar Hills Leachate Lagoon- Lagoon Upgrade
Renovation
Design
$3,500,000 est. value
WA

Decant Facility
Renovation, Infrastructure
Bidding
$2,850,000 CJ est. value
Ferndale, WA 98248

CM Services for the WPTP Raw Sewage Pump Replacement Project
New Construction
Post-Bid
$300,000 est. value
WA

Last Updated 03/01/2023 11:30 AM
Project Title

Wastewater Treatment Plant Upgrade Phase 2 - City of Kennewick

Physical Address View project details and contacts
City, State (County) Kennewick, WA 99336   (Benton County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $28,870,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes work upgrading the management and handling of biosolids to eliminste odor concerns during the treatment process as well as move away from a lagoon type trearment System. As of September 6, 2021 no new CIP issued, this project is currently in the FY 2021-2026 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents