Similar Projects
2021 Tennis Court Resurfacing
Post-Bid
Plainfield, IL 60586

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

2021 Playground Improvements - Brookmeadow and Sandalwood Parks
Results
Less than $400,000 est. value
Frankfort, IL 60423

Butler School Site Renovations
Results
Lockport, IL 60441

Vetter Road Segment II Roadway Reconstruction & Realignment Drainage Improvements
Addition
Construction
Joliet, IL

Seasons at Plainfield - Multi-Family Development
New Construction - 450,752 SF
Construction
Plainfield, IL 60585

BHS South Lot Rehabilitation
Post-Bid
Romeoville, IL

Four Seasons Park Tennis Court Refurbishment
Results
Shorewood, IL

Various Width Pavement Resurfacing
Post-Bid
Homer Glen, IL

Lake Strini Improvements.
Results
Romeoville, IL

PCC Comb. C and G Rem
Post-Bid
Joliet, IL

RR-21-4563 Veterans Memorial Tollway (I-355) Plaza 99 Spring Creek Modifications
Results
IL

Construction Variable Width Pavement
Post-Bid
Joliet, IL

2021 Parking Lot Improvements
Results
Joliet, IL 60431

W/Hot-Mix Asphalt Surface
Post-Bid
Joliet, IL

Last Updated 08/04/2022 01:09 PM
Project Title

Cedar Park Playground Renovation

Physical Address View project details and contacts
City, State (County) Lockport, IL 60441   (Will County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $65,283 [brand] Estimate
Plans Available from Copy Center - 04/29/22
Owner View project details and contacts
Architect View project details and contacts
Description

Work will include installation of playground equipment, engineered wood fiber, concrete paving, site furniture, drainage, and restoration work. Specifications require the submittal of a 10% Bid Surety with the proposal. In addition, the successful contractor(s) must be able to provide a satisfactory Performance Bond, Labor and Material Payment Bond, and required proof of insurance following the award of a contract. All bids will remain firm for 60 days after the bid opening. The Board of Commissioners of the Lockport Township Park District, Will County, Illinois reserves the right to reject any and all bids or portions thereof. Any questions should be addressed to: Greg Ludwig, Park Services, @ 815-838-5016 ext.12.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents