Last Updated 09/29/2020 07:29 AM
Project Title

Phase II- 14 Mile Transmission Main Loop Project - Double Disc Gate Valves

Physical Address View project details and contacts
City, State (County) Detroit, MI 48226   (Wayne County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work involves procurement of double disc gate valves for Phase II of the 14 Mile Transmission Main Loop Project. The construction for the 14 Mile Transmission Loop Project will be executed in two phases/contracts; Phase I, involves construction of approximately 1 mile of 24-inch transmission main along 14 Mile Rd. and Phase II will be involving the construction of approximately 8 miles of 54-inch transmission main, yard piping and reservoir fill line at the Haggerty Booster Station as well as flow control valves to regulate flows along the transmission main.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents