Similar Projects
SIUE Health Sciences Building
New Construction - 221,000 SF
Design
Less than $105,370,000 est. value
Edwardsville, IL 62025

Commissioning Services for SDM Auditorium
New Construction, Infrastructure - 37,828 SF
Bidding
Alton, IL 62002

St Louis VAMC Fire Extinguisher Inspection and Certification
Term Contract
Bidding
Jacksonville, Shiloh, IL - Creve Coeur, Florissant, O'Fallon, Saint Louis, Washington, MO 63110

Wet Dust Collector
Post-Bid
$100,000 to $250,000 est. value
Belleville, IL 62225

HVAC Close Loop Water Test-Treat
Post-Bid
Belleville, IL 62225

HVAC Chiller Maintenance
Results
Belleville, IL 62225

FY21 HVAC Cooling Tower Treatment
Results
Belleville, IL 62225

SIUE 2020 Prequal Statement for Construction
Post-Bid
Edwardsville, IL

SIUE East St. Louis Center Maintenance Shed
New Construction
Results
East Saint Louis, IL 62026

Re-Bid Insulation Repair Services For Plumbing And Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL 62701

Financial Affairs Suite Renovation
Renovation
Results
Edwardsville, IL 62025

HVAC Preventive Maintenance and Repair Services
Term Contract
Post-Bid
East Saint Louis, IL

ESL Building F
Renovation
Results
East Saint Louis, IL 62201

HVAC and Mechanical Products
Term Contract
Post-Bid

Chiller Replacement
Results
Edwardsville, IL 62025

Last Updated 11/19/2021 12:00 PM
Project Title

Boiler & Chiller Replacement

Physical Address View project details and contacts
City, State (County) Belleville, Granite City, IL 62220 (Madison, Saint Clair Counties)
Category(s) Education, Single Trades
Sub-Category(s) College/University, HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project A: PSOP Building - Boiler Replacement Project B: Sam Wolf Granite City Campus - Chiller Replacement PROJECT DESCRIPTION Project consists of labor and materials for the upgrades for the replacement of the existing boiler at the PSOP Facility in Belleville and upgrades (see Project Status) and replacement of the existing chiller at Sam Wolf Granite City Campus (Start of Construction - TBD-ASAP; Substantial Completion - May 2022).

Details

College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 07 - Thermal and Moisture Protection, Firestopping, Penetration Firestopping, Joint Sealants.
Division 09 - Finishes, Acoustical Ceilings, Acoustical Panel Ceilings, Painting, Interior Painting.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents