Similar Projects
Reported | 06/24/2020 12:00 AM |
Project Title | Construction of Port of Entry Fire Line, Tank, and Booster Pump Station |
Physical Address | View project details and contacts |
City, State (County) | Columbus, NM 88029 (Luna County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of construction of a new 197,000 gallon tank, a 1500 GPM fire pump, pump house, new yard piping, altitude valve, demolition of the existing tank, and 2130 linear feet of 10" fire line. The project is located in the southern portion of the Village of Columbus, New Mexico. The fire line begins at the same location of an existing stand pipe located at the intersection of Contento Avenue and Quinta Ave. The fire line proceeds to the south down the Quinta Ave, then turns to the east to follow Botanico Avenue. The fire line then proceeds to cross NM-11 via jacking and boring, then turns southward parallel to NM-11 to the edge of the new GSA facility. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |