Similar Projects
Maryland City Structural and Safety Tank Rehabilitation
Infrastructure
Bidding
$1,000,000 to $1,500,000 est. value
Annapolis, MD

Fire Suppression Tank - Drafting Tank
Infrastructure
Bidding
$250,000 to $500,000 est. value
Davidsonville, MD 21035

4,000 Gallon Storage Tank for Blue Juice Lavfluid
Post-Bid
Andrews Air Force Base, MD 20762

Design Build Water Tower Repairs
Post-Bid
Germantown, MD 20874

Cliffton Water System Improvements - Elevated Storage Tank
Results
Newburg, MD 20664

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Multiple Water Tower Rehabilitation Project
Infrastructure
Bidding
Waldorf, MD

Bonnie Brook Water Facilities Upgrade
Infrastructure
Post-Bid
Cambridge, MD

Ballast Tank Preservation
Results
Baltimore, MD

Tank Replacement at Maryland State Police - Prince Frederick Barrack U
Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value
Prince Frederick, MD 20678

Operational Superintendent for the Water and Wastewater Treatment Plants
Renovation, Term Contract
Post-Bid
Beltsville, MD 20705

World-Wide Water Storage Tank Remediation
Term Contract
Results

Tank Inspection
Term Contract
Bidding
Andrews Air Force Base, MD

Germantown Water Tower
Term Contract
Post-Bid
Germantown, MD 20874

Elevated Water Storage Tank
Results
Keedysville, MD 21756

Reported 11/23/2021 12:00 AM
Project Title

Cistern Troubleshooting and Repairs - Evergreen Elementary School

Physical Address View project details and contacts
City, State (County) California, MD 20619   (Saint Marys County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. The cistern tanks currently installed at this site are 15,000 gallon tanks, having a 12’3” outside diameter with a nominal stave of 20’, fitted with a 60-mil flexible PVC liner 2. The services provided will be inspection, evaluation of the existing cistern tanks and liners, and recommendation on repairs. The contractor will be expected to provide a cost estimate for these services and repairs based on the hourly rates and material mark ups as indicated on the pricing sheet. 3. The contractor will be responsible for all permits as needed. 4. WARRANTY - The product specified shall be free from defects in materials and workmanship for a period of 1 year and for a period of 2 years for all parts. Warranty period shall start from date of installation as stated on warranty card.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents