Similar Projects
Oakes Ames Memorial Hall
Renovation
Post-Bid
North Easton, MA 02356

National Roofing Program (NRP) Design/Build Nationwide
Post-Bid

Roofing Replacement
Results
Taunton, MA 02780

Plymouth Street Fire Improvements: Roofing, HVAC and Windows - Filed Sub-Bids
Results
$700,000 est. value
Mansfield, MA 02048

Roof and Soffit Replacement, Greenwood Terrace 667-1
Post-Bid
Less than $26,852 est. value
Westport, MA 02790

New Bedford Fire Museum Roof and Window Replacement
Results
Less than $140,625 est. value
New Bedford, MA 02740

Phase 4 Roof Replacement at Father Vincent Diaferio Village
Post-Bid
$240,000 est. value
Fall River, MA 02723

Replace Roof at 3 Eisenhower Drive in Easton
Results
Easton, MA

Roof and Windows Replacement at the Former Potterville School Building, 115 Wood Street
Post-Bid
Somerset, MA

Repair and Replace Roof at Public Works Maintenance Facility
Results
Dighton, MA 02715

Highway Department Salt Shed Replacement Project - Filed Sub-Bids
Post-Bid
Less than $660,000 est. value
Raynham, MA 02767

New Roof for Briggs Road Fire Station
Results
Less than $60,000 est. value
Westport, MA

Community Building Roof Replacement
Post-Bid
Less than $84,604 est. value
Seekonk, MA

Oak Village Roof Replacement
Results
Less than $348,583 est. value
Fall River, MA

General Contractors for the 705-2 Roof Replacement
Post-Bid
Less than $74,000 est. value
North Attleborough, MA

Last Updated 12/13/2018 05:12 AM
Project Title

Roof Replacement at Administrative Building, Maintenance Building and Gwozdz Terrace

Physical Address View project details and contacts
City, State (County) Taunton, MA   (Bristol County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $584,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description DCAMM Certification Required. The Project consists of: the removal and replacement of existing Asphalt shingle/EPDM roofing systems inclusive of flashing, edge metal, ice and water shield, PVC soffits, PVC Fascias, gutters & downspouts, gutter guards and roof drains. It also includes minor masonry repair as required to install an additional scupper. This project contains a phasing aspect which will require the contractor to initially mobilize at 30 Olney Street and perform the work within 45 calendar days prior to the winter months. Upon completion of Olney Street the contractor will then shut-down operations until spring. Once the weather breaks in the spring the contractor will then mobilize at Kilmer and Whittenton street with the understanding that this phase will be completed in 105 calendar days from the spring mobilization.
Details
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents