Similar Projects
Park Vista at El Tesoro Lift Station Facilities
New Construction
Bidding
Houston, TX 77083

Construction of Bridge Creek Lift Station No. 1
New Construction
Bidding
$1,094,000 est. value
TX

Golden Acres WWTP Influent Lift Station
Post-Bid
Pasadena, TX 77506

NHCRWA State Highway 249 Regional Pump Station Project 24C
New Construction
Post-Bid
$85,000,000 to $95,000,000 est. value
TX

Fountain View Regional LS Construction and Abandonment of Westheimer No. 1 LS
Results
$21,957,065 est. value
Houston, TX

Wastewater Treatment Plant Number 2 Lift Station to Serve
Results
Less than $2,326,844 est. value
Houston, TX 77002

Wood Trace Wastewater Treatment Plant - Phase 2 (0.270 MGD) and Lift Station Number 1 - Phase 2
New Construction
Bidding
TX

Booster Pump Replacement Project
Post-Bid
Bellaire, TX

Mill Creek Lift Station Conversion and Wastewater Treatment Plant and Lift Station Improvements
Results
Humble, TX 77338

HPW - Lift Station Renewal and Replacement - Green River Drive, Bretshire No. 2, Bayfield, Highland Meadow, Hempstead No. 1, and Ferguson Way Lift Stations
New Construction
Bidding
$9,485,191 est. value
TX

Inspection, Maintenance, Repair and Related Items of Lift Station
Term Contract
Post-Bid
Less than $220,000 est. value
Houston, TX

Booster Pump Replacement
Results

HPW - Lift Station Renewal and Replacement - Northborough Drive 1, Northborough Drive 2, Old Katy Road, Richmond 1 and Bonner Road Lift Stations
Renovation
Bidding
$9,574,050 est. value
Houston, TX 77007

Reclaimed Water Pump Station
New Construction
Post-Bid
$1,070,000 est. value
TX

Sanitary Sewer Lift Station Stuebner Hollow
Results
Houston, TX 77070

Reported 09/29/2021 12:00 AM
Project Title

Katy Townhomes Lift Station

Physical Address View project details and contacts
City, State (County) Katy, TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $550,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of providing the necessary labor, materials, equipment, and supervision to construct Katy Townhomes Lift Station including but not limited to mobilization, bonds and insurance; construction of an 6-foot (6') diameter pre-cast concrete wet well, complete with two (2) submersible pumps with all accessories, riser piping, valves, coatings, fence and gates, site work, concrete pavement, on-site sanitary sewer piping including well pointing and dewatering as necessary, on-site manhole, on-site force main, water line, 40-kW diesel engine generator, sound attenuated weatherproof level 2 enclosure and 24-hour integral storage tank, generator concrete pad, automatic transfer switch, load bank testing, lift station control panel, automatic telephone dialer, electrical service disconnect switches, conduit, wire; trench safety system at all depths; Storm Water Pollution Prevention Plan implementation, maintenance, and record keeping; and all else as shown on the construction drawings and detailed in the specifications for a fully functioning lift station; and all else shown on the construction drawings and detailed in the specifications for the off-site sanitary sewer to discharge to the existing system.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents