Similar Projects
The Davis Community
New Construction - 211,475 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Wilmington, NC 28411

Hayes Barton Place
New Construction
Conception
Raleigh, NC

Senior Continuing Care Retirement Community
New Construction
Design
Cherokee, NC

Midtown Exchange
New Construction - 946,500 SF
Design
$1,000,000,000 est. value
Raleigh, NC 27609

Verena At Bedford Falls Renovation
Renovation - 233,260 SF
Post-Bid
Raleigh, NC 27600

1603 And 1593 Monroe Police Station Monroe Senior Center
New Construction, Renovation - 59,596 SF
Results
Monroe, NC 28112

The Terraces
New Construction, Addition
Construction
Charlotte, NC 28210

Trinity Landing Phase I & Phase II
New Construction - 398,219 SF
Construction
$94,000,000 est. value
Wilmington, NC 28409

Heritage Hills Expansion
New Construction - 18,655 SF
Pending Verification
Hendersonville, NC 28791

Liberty Senior Living Development
New Construction - 461,000 SF
Conception
$10,000,000 CJ est. value
Wilmington, NC

Deerfield Phase III
New Construction
Design
Asheville, NC 28803

The Crossings at Brookberry
New Construction - 152,350 SF
Construction
$10,000,000 CJ est. value
Winston-Salem, NC 27106

Caroline
New Construction - 95,000 SF
Conception
Cornelius, NC 28078

The Landings of Flat Rock
New Construction - 32,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Flat Rock, NC 28731

Arbor Ridge at Huntersville
New Construction - 209,150 SF
Construction
$10,000,000 CJ est. value
Huntersville, NC 28078

Last Updated 11/10/2021 03:36 PM
Project Title

Shelbourne Senior Living

Physical Address View project details and contacts
City, State (County) Cary, NC   (Wake County)
Category(s) Residential
Sub-Category(s) Assisted Living Facility
Contracting Method
Project Status Construction Commenced June 2020, Construction Completion Expected January 2022
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Assisted Living Facility, 4 Stories Above Grade, 199,286 SF New Construction 138 Unit(s), 13 Acres, 119 Parking Spaces.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents