Similar Projects
Catch Basin Cleaning Services
Term Contract
Results
Freeport, ME

Presumpscot North Main Interceptor Rehabilitation Relocation SSMH-5377
Results
$600,000 est. value
Portland, ME

Cumberland Street Sewer and Storm Drain Upgrades
Results
Westbrook, ME

2021 Lining Projects
Results
Westbrook, ME

Fore Street/Eastern Promenade Sewer Separation
Results
Portland, ME 04101

Water / Sewer Service Installation at 145 Allagash Drive
Infrastructure
Post-Bid
Brunswick, ME 04011

Water and Sewer Main Replacements in Concord Street
Infrastructure
Results
Portland, ME 04103

2021 Sewer Lining Project
Infrastructure
Results
South Portland, ME

Surf Road Sewer and Drainage Improvements Project
Infrastructure
Results
Cape Elizabeth, ME 04107

2022 Lining Projects
Infrastructure
Post-Bid
Westbrook, ME

2022 Brackett Street Sewer Replacement
Infrastructure
Post-Bid
Westbrook, ME 04092

Septic Tank Pumping and Pump Station Maintenance Work
Infrastructure
Results

West Falmouth Sewer Improvements Phase 1
Infrastructure
Results
$6,000,000 est. value
Falmouth, ME

Catch Basin Cleaning
Term Contract
Post-Bid
Portland, ME

Grout Pumping Services Statewide
Infrastructure
Post-Bid

Reported 05/27/2022 12:00 AM
Project Title

Forest Avenue at Avalon Road Sewer Separation Project

Physical Address View project details and contacts
City, State (County) Portland, ME 04103   (Cumberland County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes, but, is not limited to the following items: 1. Installation of approximately 200 linear feet of new gravity storm drain pipe, dewatering, installation of precast catch basins and drain manholes, new ADA ramps, associated construction for street trench repair, pedestrian and vehicle traffic control during construction and other Incidental work including; support of existing underground utilities including water, natural gas, electrical and telecommunications utilities during excavations. 2. The work also includes (under separate contract with the Portland Water District) water main replacement (approximately 140 linear feet) and associated construction as indicated on the plans and Specifications including Maintenance of temporary water service during construction; Traffic control; Relocation /reconnection of existing water service laterals which may conflict with work. Prebid Meeting: There will be no prebid meeting for this project.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents