Similar Projects
Azalia Solar Farm / Milan Township
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Dundee, MI 48131

Dunham Street Improvements
Infrastructure
Design
$1,767,953 CJ est. value
Dundee, MI 48131

Full Depth Concrete Repair on I-75
Infrastructure
Bidding
$998,000 CJ est. value
Monroe, MI 48162

Hot Mix Asphalt Widening and Resurfacing, Aggregate Shoulders and Pavement Markings on South Huron River Drive
Infrastructure
Bidding
$756,000 CJ est. value
Charter Township of Berlin, MI 48179

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Monroe Consolidated Drain Improvements
New Construction, Infrastructure
Post-Bid
$2,342,874 CJ est. value
Monroe, MI 48161

Sterling State Park - Heritage Trail Improvements
Infrastructure
Results
$2,401,502 CJ est. value
Monroe, MI 48162

USDA Wastewater System Improvement
Infrastructure
Results
$8,402,269 CJ est. value
Carleton, MI 48117

ProMedica Monroe Regional Hospital / Frenchtown Charter Township
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Monroe, MI 48162

2023 Bond - Airport Community Schools
Addition, Renovation, Infrastructure
Pending Verification
$64,240,000 CJ est. value
Carleton, MI 48117

Sterling State Park - Fishing Pier
Infrastructure
Post-Bid
$500,000 CJ est. value
Monroe, MI 48162

Father Cairns Park Improvements
Infrastructure, Renovation
Results
$2,650,369 CJ est. value
Monroe, MI 48162

RFQ Contractor - Monroe Harbor Advanced Maintenance Dredging
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Monroe, MI 48161

2023 Water Main and Street Paving Program
Infrastructure
Results
$3,589,913 CJ est. value
Monroe, MI 48161

Non-Standard Material Water Service Replacement
Infrastructure
Post-Bid
$200,000 CJ est. value
Milan, MI 48160

Last Updated 06/28/2023 02:10 PM
Project Title

Toyota Motor North America Laboratory Facility

Physical Address View project details and contacts
City, State (County) Milan, MI 48160   (Monroe County)
Category(s) Heavy and Highway, Industrial/Manufacturing, Laboratory
Sub-Category(s) Laboratory, Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $47,700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the development of a laboratory facility. Exact scope details and location have not been released. As of June 28, 2023, this project has been announced. Information regarding an architect and general contractor has not been released. A firm construction timeline has not been established; however, construction is not expected to begin before second quarter 2024. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents