Similar Projects
Water Sanitary Sewer and Drainage Facilities to Serve Westland Ranch Section 7 and Muldoon Parkway Phase 2 in League City
Infrastructure
Bidding
League City, TX

Sabine Pass to Galveston Bay Port Arthur & Vicinity Contract 2
Post-Bid
$20,000,000 est. value
Galveston, TX

Canal System Restoration, Project Site Group I
Post-Bid
Texas City, TX 77591

Repair Sabine Pass to Galveston Bay, Galveston County, Texas
Results
$10,000,000 to $25,000,000 est. value
Galveston, TX 77554

Sanitary Sewer Water Line Drainage Facilities Paving Detention Ponds Lift Station and Force Main to Serve Westland Ranch Section 1 Section 3 Section 6 Muldoon Parkway and Maple Leaf Drive Extension
Results
TX

Steel Riveted Corrugated Metal Pipe
Post-Bid
Texas City, TX

Z--IDIQ for Stream Gage Site Rprs, Oklahoma and Texas
Results

Willow Bayou/Avenue L Drainage
Post-Bid
$1,700,000 est. value
Galveston, TX 77551

Church Street Drainage Improvements 33rd - 37th
Term Contract
Results
Less than $1,500,000 est. value
Galveston, TX 77551

Galveston Seawall Rip Rap Deficiencies West of 61st Street
Post-Bid
$2,200,000 est. value
Galveston, TX

Construction of Lago Mar Detention Phase II B Grading
Results
Texas City, TX

Construction of Water, Sanitary Sewer, Drainage and Paving to Serve Westwood Section 9
Post-Bid
League City, TX

Gum Bayou Tributary Channel Improvements
Results
Less than $735,000 est. value
Galveston, TX 77550

Centennial Park and Lakes of Falcon Ridge Wall Project
Post-Bid
Friendswood, TX

Construction of Detention Phase II C Grading
Results
$400,000 est. value
Texas City, TX

Last Updated 09/24/2021 08:06 AM
Project Title

Hurricane Harvey Drainage Repair Project - Phase I (Package A)

Physical Address View project details and contacts
City, State (County) League City, TX   (Galveston County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $550,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes but not limited to the excavation and stabilization of channel slopes with riprap, concrete channel lining replacement and 36" storm sewer replacement, SW3P.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents