Similar Projects
Winter Storm Project #1
Alteration
Bidding
Grambling, LA

Winter Storm Project #2
Alteration
Bidding
Grambling, LA

Metal Roof Repairs and Interior Repairs
Alteration
Post-Bid
Sulphur, LA

Lakefront Parking Garage - Phase II
New Construction, Alteration
Post-Bid
Lake Charles, LA

Miscellaneous Acoustical Ceiling Work
Alteration
Results
New Orleans, LA

Rusted Areas On Wall Panels and Trim, Fabricate (6) Six Cover Panels 6 Tall in Damaged Panell Areas
Alteration
Results
Gretna, LA

Winter Storm Project #3
Alteration
Bidding
Grambling, LA

Equipment and Turnkey Installation
Alteration
Post-Bid
Crowley, LA

Fall Protection
Alteration
Results
New Orleans, LA 70118

Winter Storm Project #4
Alteration
Bidding
Grambling, LA

Repair of CMU Wall, Construct Interior Structural Steel Support and Replace Roof at The Wastewater Treatment Plant (Plant Shop - Vehicle Storage Building)
Renovation, Alteration
Post-Bid
Alexandria, LA

Restoration of Hurricane Damage to the Cafeteria/Band Building at Gueydan High School
Renovation, Infrastructure, Alteration
Results
LA

East Saint John High School Hurricane IDA Disaster Related Interior Repairs
Alteration
Bidding
Reserve, LA 70084

Claiborne Creek Phase 2 - Remove Balconies / Repair Water Damage
Alteration
Post-Bid
West Monroe, LA 71291

Annual Insulation for CD Rehabilitation
Term Contract
Results
Lafayette, LA

Reported 02/19/2022 12:00 AM
Project Title

Glass Cubicle Enclosure

Physical Address View project details and contacts
City, State (County) New Orleans, LA 70122   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide Labor, Equipment and Materials to Install (2) Interior Heavy Glass Entrance Doors and Sidelights with the Following 3/8" Satin Etched Glass 1-3/4" X 4" Header at the Top of the Sidelights "U" Channel at the Bottom of the Sidelights Wall Mounted Sliding Door Rail Glass Mounted Door Rollers Bottom Door Patch Lock Dust Proof Strike Mounted in the Floor 12" Back to Back Thru Glass Pull Remove all construction debris and dispose off site. Repair any damage caused to site during work performed.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents