Similar Projects
Albany at the Capital District Psychiatric Center Minor Maintenance Contract - HVAC Mechanical Work
Bidding
Albany, NY 12208

HVAC Testing and Balance - Districtwide
Term Contract
Bidding
White Plains, NY 10605

HVAC Upgrades - William Boyce Thompson School
Post-Bid
Yonkers, NY

J--HVAC and Duct Cleaning of Wards 5C, 9A, and OR
Post-Bid
Buffalo, NY 14215

L23127 Nevaldine Sourth 133 Esports, Phase 2
Results
Canton, NY

Washington County Municipal Center Cooling Tower Replacement
Results
Fort Edward, NY 12828

Districtwide Kitchen Exhaust Hood
Bidding
Spring Valley, NY 10977

Temporary Chiller
Post-Bid
Potsdam, NY

HVAC Purchase and Installation
Results
Mohegan Lake, NY 10547

Ice Arena Dehumidification
Bidding
Less than $200,000 est. value
Cortland, NY 13045

Preventative Maintenance Contract for HVAC and Mechanical Equipment
Term Contract
Post-Bid

Repair Heating / Ventilation Controls at Kingston Armory
Results
$275,000 to $550,000 est. value
Kingston, NY

Furnish and Delivery of Burnham Boilers and other HVAC Equipment
Post-Bid
Yonkers, NY 10701

J--Batavia Boiler Plant Work (Va-19-00027248)
Results
Batavia, NY 14020

Hydro Air System A/C and Heat for the Town House
Post-Bid
South Salem, NY 10590

Reported 12/22/2018 12:00 AM
Project Title

Memorial Library Chiller Replacement

Physical Address View project details and contacts
City, State (County) Cortland, NY 13045   (Cortland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value $360,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description Scope of this work includes: Replacement of two 150 ton water cooled chillers with two 90 ton air cooled chillers. This will include replacement of two BAC cooling towers on roof with two roof mounted remote condensing units, replacement of electrical supply power to Chiller 1 to switch over to 208v power, new CHW pumps with VFDs to capture energy savings, and integration of new equipment to building automation system. 10% minority workforce and 10% female workforce
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents