Similar Projects
Heritage Community Park and Police Department Parking Lot Improvements
Post-Bid
Glenn Heights, TX 75154

CRWS Maintenance Parking Improvements
Post-Bid
Dallas, TX 75212

2015 Residential Sidewalk Replacement Program Region 4
Results
$873,921 est. value
Richardson, TX 75080

Wagging Tail Dog Park - Parking Improvements
Results
$256,793 est. value
Dallas, TX 75248

Walmart Supercenter #3224-256 - Ogp-Ce
Renovation - 850 SF
Construction
Less than $7,161 est. value
Garland, TX 75043

Streetscape and Sidewalk Repair
Post-Bid
TX 75200

Garland Pedestrian Path
Results
$1,385,000 est. value
Garland, TX 75042

White Rock Lake Trail - Bath House to Winfrey Point
Infrastructure
Post-Bid
Dallas, TX

MGR Bikeway
Results
$2,100,000 to $2,400,000 est. value
Garland, TX 75040

Parking Lot Repair
Infrastructure
Post-Bid
Dallas, TX 75224

Kinwest Debris Interceptors
Results
$375,407 est. value
Irving, TX 75060

Polyurethane Foam Injection- Concrete Leveling
Term Contract
Post-Bid
Irving, TX

CDBG Sidewalk Improvement Project
Results
Mesquite, TX 75149

Reclamation and Resurfacing of Parking Lots at Irwin Park and Guy Berry Park
Infrastructure
Post-Bid
Balch Springs, TX 75180

Balch Springs Alexander Village Trail & Pedestrian Bridge
Results
Less than $120,000 est. value
Balch Springs, TX 75181

Last Updated 09/27/2021 04:46 PM
Project Title

Mesquite-Garland Trail Connector

Physical Address View project details and contacts
City, State (County) Mesquite, TX   (Dallas County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project is designed to construct a hike and bike trail from the existing Mesquite Heritage Trail east then north within utility easements to the Garland city limits on Duck Creek. Trail is approximately 2,500 linear feet in length and willbe 12’ wide reinforced concrete including installation of storm drainage pipe and box culverts, grading, sodding, and other appurtenances.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents