Similar Projects
As-Needed Replacement Bus Shelter Glass- Multi-Year Award
Alteration
Bidding
New Port Richey, FL

Town Hall Improvements
Alteration
Bidding
$969,365 est. value
Longboat Key, FL

Indian River Elementary School Door Replacement Building 1 and 4
Alteration
Sub-Bidding
Edgewater, FL 32141

Belle Glade Senior Center
Post-Bid
Belle Glade, FL 33430

POCC Window Shutters - Fema Project #4337-61-R
Post-Bid
Daytona Beach, FL 32114

Hardening Wind Retrofit of Fire Stations 2, 3 and 4
Results
Less than $193,000 est. value
Palm Bay, FL 32907

Indoor/Outdoor Public Address System
Results
Gainesville, FL 32609

Beach Parks Restroom Doors
Alteration
Bidding
Sanibel, FL 33957

WVCC Window Shutters - Fema Project #4337-54-R
Post-Bid
Daytona Beach, FL 32114

Highridge Family Center- Storefront Door System Installation
Term Contract
Results
Less than $370,000 est. value
West Palm Beach, FL 33407

Town Hall Hardening Windows and Doors Replacement
Alteration
Bidding
Pembroke Park, FL 33023

SEVCC Window Shutters - Fema Project #4337-352-R
Post-Bid
Daytona Beach, FL 32114

Sarasota Service Office Glass Replacement - Building 1
Results
Sarasota, FL 34240

Impact Windows and Doors
Alteration
Bidding
Fort Lauderdale, FL 33311

Purchase and Installation of Doors and Windows for the J.R. Dean WTP
Post-Bid
Florida City, FL 33034

Last Updated 12/02/2021 11:46 AM
Project Title

New Impact - Resistant Doors, Windows and Fixed Glass Panels in the Wickline Building

Physical Address View project details and contacts
City, State (County) Flagler Beach, FL 32136   (Flagler County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of site mobilization and demobilization; removal of all trim work (salvage to be reused as is practical); removal of twenty-five single hung windows and their movement mechanisms; removal of 1 set of exterior double doors; two single doors; 2 sidelights; 2 transoms. Replace all the above with equal number of doors, sidelights and transoms with impact-resistant, low E glazing; add all blocking and shims necessary to fit components into the existing rough openings; replace all trim material that was salvaged in the demolition or replace with treated wood (exterior) and Grade C select pine (interior) at sizes to match existing; repair interior and exterior plaster where damaged by demolition or installation; paint all new surfaces to match existing.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents