Similar Projects
South Platte Water Quality Modeling
Post-Bid
Denver, CO

Florida and Kendall to Mexico and Kendall Water Line Replacement
Infrastructure
Bidding
Lakewood, CO

East Iliff Avenue and South Quebec Street Meter Vault Replacement
Infrastructure
Post-Bid
Denver, CO 80239

Transport Sub Area 1 Filing 1 Road and Utility Construction Project
Infrastructure
Results
Denver, CO

CO-Leadville NFH-Parking Lot Manhole Drain
Term Contract
Results
$25,000 to $100,000 est. value
Leadville, CO 80461

Water Meter
Term Contract
Post-Bid
CO

Porteos Phase 8 (Segment 5) (Project)
Results
Denver, CO 80239

East 64th Avenue Improvements Himalaya to Picadilly
Infrastructure
Results
Denver, CO 80238

Remove and Replace Water Meter Vault at LCIN/Vet Park
Infrastructure
Results
Less than $90,000 est. value
Denver, CO 80203

North Chiller Plant Chilled Waterline Replacement
Results
Less than $150,000 est. value
Denver, CO

East 64th Avenue and Denali Street Infrastructure Project
Results
Denver, CO 80202

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

High Point 66th and 67th Avenue Project
Infrastructure
Post-Bid
Denver, CO 80249

Water Advanced Metering Infrastructure Fixed Network System Phase II, Year 2022
Infrastructure
Post-Bid
CO

Last Updated 01/31/2022 10:02 AM
Project Title

Water Line Improvements

Physical Address View project details and contacts
City, State (County) Denver, CO   (Denver County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Contract provides for the construction of the following: Furnish and install over 10,000 LF of 6-inch to 12-inch water line with appurtenances, over 7,500 LF of 8-inch to 12-inch sanitary sewer line with appurtenances, and approximately 153 services of water and 59 services of sanitary sewer. Also, furnish and install over 6,000 LF of 18-inch to 48-inch storm sewer pipe with appurtenances, and over 2.5 miles of street and alley construction.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents